Project
Benefiting
Member States
Region
Mtwara - Liganga Muchuchuma - Songea Mbamba railway
Tanzania, Zambia,
Malawi and
Mozambique
SADC Mtwara
corridor
Manyoni - Tabora - Kigoma
road: rehabilitation
Tanzania, Rwanda,
Burundi and DRC
Kisarawe - Dar-es-Salaam:
construction of ICD
Project Cost Expected
Estimate
Completion
($ million)
Year
Project Status
1,386
2012 – 2017 Feasibility study completed
by Japan International
Cooperation Agency
( JICA) and the National
Development Council (NDC).
Detailed design pending
SADC
Tripartite
Central
corridor
450
2012 – 2017 Detailed design and tender
documents completed. Works
ongoing in some sections
Tanzania, Rwanda,
Burundi, DRC,
Malawi and Zambia
SADC Dares-Salaam
and Central
corridors
120
2012 – 2017 Pre-feasibility study
completed. RFP for feasibility
study issued
Kolwezi - Dilolo road (Angola
border, SADC Route 20,
426 km): rehabilitation
DRC, Zambia and
Angola
SADC Lobito
corridor
Kinshasa - Inkisi - Ngindinga Mbanza Sosso road (Angola
border, 120 km): rehabilitation
Angola and DRC
SADC Malanje
corridor/PIDA
TAH 3
120
2012 – 2017 Feasibility study completed
Kisangani - Niania - Bunia Beni- Kasindi (Uganda border,
845 km): rehabilitation
DRC, Rwanda,
Uganda, Tanzania
and Kenya
SADC
Tripartite
Northern
and Central
corridors
700
2012 – 2016 Feasibility study completed.
Detailed design and
construction pending
Tshikapa - Angola border (117
km)
Angola and DRC
SADC Malanje
corridor
118
2012 – 2016 Pre-feasibility study
completed. Funding for full
feasibility and detailed design
pending
Kolwezi - Dilolo railway:
rehabilitation
DRC, Zambia and
Angola
SADC Lobito
corridor
250
2012 – 2016 Pre-feasibility study
completed. Funding for full
feasibility and detailed design
pending
Kinshasa - Ilebo railway link:
construction
DRC, Zambia,
Zimbabwe, South
Africa, Botswana
and Tanzania
SADC NSC,
Trans-Caprivi,
Beira and
Maputo
corridors
8
2012 – 2016 Pre-feasibility study
completed. Funding for
detailed design required
Ponta Techobanine,
Mozambique: heavy haul
railway line and port
Mozambique,
Botswana,
Zimbabwe, South
Africa and Swaziland
Maputo
corridor,
North-South
corridor
1.7
2012 – 2019 Abridged executive summary
completed in August 2010,
and three countries have
agreed to finance the prefeasibility study at a cost of
US$1.8 million, equally shared
among them
Sena Line Railway:
rehabilitation and upgrade
Mozambique,
Zambia and
Zimbabwe
Beira corridor
Nacala: line and new coal
terminal
Mozambique and
Malawi
Nacala
corridor
2
200
1.5
2012 – 2017 Pre-feasibility study done.
Feasibility and detailed
design pending
2013 – 2015 Tender documents and
contractor proposals ready
2012 – 2015 Detailed engineering studies
Executive Summary