Project Benefiting Member States Region Mtwara - Liganga Muchuchuma - Songea Mbamba railway Tanzania, Zambia, Malawi and Mozambique SADC Mtwara corridor Manyoni - Tabora - Kigoma road: rehabilitation Tanzania, Rwanda, Burundi and DRC Kisarawe - Dar-es-Salaam: construction of ICD Project Cost Expected Estimate Completion ($ million) Year Project Status 1,386 2012 – 2017 Feasibility study completed by Japan International Cooperation Agency ( JICA) and the National Development Council (NDC). Detailed design pending SADC Tripartite Central corridor 450 2012 – 2017 Detailed design and tender documents completed. Works ongoing in some sections Tanzania, Rwanda, Burundi, DRC, Malawi and Zambia SADC Dares-Salaam and Central corridors 120 2012 – 2017 Pre-feasibility study completed. RFP for feasibility study issued Kolwezi - Dilolo road (Angola border, SADC Route 20, 426 km): rehabilitation DRC, Zambia and Angola SADC Lobito corridor Kinshasa - Inkisi - Ngindinga Mbanza Sosso road (Angola border, 120 km): rehabilitation Angola and DRC SADC Malanje corridor/PIDA TAH 3 120 2012 – 2017 Feasibility study completed Kisangani - Niania - Bunia Beni- Kasindi (Uganda border, 845 km): rehabilitation DRC, Rwanda, Uganda, Tanzania and Kenya SADC Tripartite Northern and Central corridors 700 2012 – 2016 Feasibility study completed. Detailed design and construction pending Tshikapa - Angola border (117 km) Angola and DRC SADC Malanje corridor 118 2012 – 2016 Pre-feasibility study completed. Funding for full feasibility and detailed design pending Kolwezi - Dilolo railway: rehabilitation DRC, Zambia and Angola SADC Lobito corridor 250 2012 – 2016 Pre-feasibility study completed. Funding for full feasibility and detailed design pending Kinshasa - Ilebo railway link: construction DRC, Zambia, Zimbabwe, South Africa, Botswana and Tanzania SADC NSC, Trans-Caprivi, Beira and Maputo corridors 8 2012 – 2016 Pre-feasibility study completed. Funding for detailed design required Ponta Techobanine, Mozambique: heavy haul railway line and port Mozambique, Botswana, Zimbabwe, South Africa and Swaziland Maputo corridor, North-South corridor 1.7 2012 – 2019 Abridged executive summary completed in August 2010, and three countries have agreed to finance the prefeasibility study at a cost of US$1.8 million, equally shared among them Sena Line Railway: rehabilitation and upgrade Mozambique, Zambia and Zimbabwe Beira corridor Nacala: line and new coal terminal Mozambique and Malawi Nacala corridor 2 200 1.5 2012 – 2017 Pre-feasibility study done. Feasibility and detailed design pending 2013 – 2015 Tender documents and contractor proposals ready 2012 – 2015 Detailed engineering studies Executive Summary 31

Select target paragraph3