Movene Dam (Project P1‐7)  The  dam  will  be  instrumental  in  poverty  eradication,  as  the  water  supply  from  the  dam  will  assist  small‐holder  farmers  in  Mozambique,  as  well  as  provide  much  needed  water  for  mainly  the  peri‐ urban  population  with  poor  water  supply  and  sanitation.  The  dam  would  supplement  the  existing  Pequenos Limbobos Dam.     The selection of a concrete dam is motivated by the occurrence of flash floods in the area, and the  dam  is  proposed  to  be  constructed  as  an  overflow  weir  without  gates.  The  active  storage  volume  would be about 50 x 106 m3.    It  is  estimated  that  the  project  will  supply  50  000  people  with  a  safe  water  supply  and  sanitation  service, irrigate 300 hectares of land and generate about 10 MW of hydropower.     The project proponent is the National Directorate of Water (DNA), with ARA South in Mozambique  being the project's implementing agent. Pre‐feasibility studies and a comprehensive environmental  and social impact assessment need to be completed by 2013. Feasibility studies would then follow in  2014.  Detailed  designs  and  tendering  for  construction  will  be  done  in  2015.  Implementation  and  construction of the associated project components is expected to start in 2016 and will be completed  by 2018.     The estimated total project costs are US$11 million. The project can be considered to be in Phase 1 of  the ICA Project Development Phases. Possible project financiers are USAID and the World Bank.    The major project challenge is the timely sourcing of project finances.     Artificial Recharge of Windhoek Aquifer ‐ Phases 2B and 3 (Project P1‐8)  The  Windhoek  Aquifer  is  an  important  source  of  water  for  Windhoek,  especially  during  periods  of  drought  when  the  levels  of  surface  dams  are  very  low  and  when  the  supply  from  these  sources  is  reduced. Over a period of 55 years, the regular abstraction of water from the aquifer has resulted in  the lowering of the groundwater table by an average of 50 to 60 m. After heavy abstraction during a  drought, approximately five years of natural recharge is required before water levels return to pre‐ drought  conditions.  Managed  aquifer  recharge  (water  banking)  would  fill  up  the  aquifer,  thereby  increasing the security of supply using treated surface water, blended with reclaimed water from the  reclamation  plant,  which  will  not  be  subjected  to  evaporation.  Evaporation  in  the  central  areas  of  Namibia is approximately 3 400 mm per year, compared with Windhoek's average annual rainfall of  366 mm. Managed aquifer recharge will take place when excess water is available from the surface  dams, as well as from the production wells.     This project will benefit all residents of Windhoek, as it will improve the security of water supply to  the  city.  This,  in  turn,  will  ensure  that  businesses  and  industries  will  be  less  affected  by  water  rationing  during  periods  of  drought.  The  security  of  supply  would  attract  new  investments,  which  again contributes to poverty eradication and improved livelihoods.    The ultimate recharge capacity required will amount to 8.0 x 106  m3 per year. This is a surface water  storage project, used only in cases of water shortages for the benefit of the same population. There  will thus be no increase in the number of persons served, but in security of supply.    The project proponent is the Ministry of Agriculture, Water and Forestry with NamWater being the  implementing agency. Phases 1 and 2A of the project were completed in 2003 and 2011 respectively.  The  feasibility  studies  for  Phase  2B  (EIA,  siting,  drilling  and  test  pumping  of  eight  deep  production  boreholes  and  eight  recharge  wells)  commenced  and  will  be  concluded  by  the  end  of  2012.  The    64

Select target paragraph3