The major project challenges include:         Obtaining final approval to proceed with the project from both governments;  Timely sourcing of project finances;  The  establishment  of  the  Songwe  River  Basin  Authority,  which  will  take  time,  but  will  contribute to the consolidation of the good cooperation between the two countries and the  implementation of such projects;  In  order  to  minimise  the  risk  of  low  stakeholder  response  to  the  project,  considerable  attention  has  to  be  paid  to  the  environmental  and  social  issues,  including  mitigation,  resettlement,  compensation  schemes,  land  tenure  security,  gender  equality  and  stakeholder  involvement throughout the project's lifecycle. The project’s focus on economic development  and poverty eradication should also encourage positive stakeholder response; and  Changed hydrological conditions due to climate change and variability is a potential threat to  the  economic  viability  of  the  investment.  The  project  includes  an  analysis  of  hydrological  sensitivity to clarify the risks and advise on possible mitigation measures to be taken by  the  Songwe River Basin Authority once established.     Vaal‐Gamagara Water Supply Project (Project XB‐2)  Water availability in Botswana decreases from the east to the west, with the south‐western corner of  Botswana  having  the  least  reliable  water  supply.  The  residents  in  this  area  suffer  constant  water  supply constraints, which compromises their quality of life. As most of the country’s water sources  are  found  in  the  north‐east  of  the  country,  Botswana  has  proposed  that  water  supplies  to  the  southwest be sourced from the Vaal River in South Africa, which is part of the Orange‐Senqu River  Basin.  Botswana  is  a  member  of  the  Orange  Senqu  River  Basin  Commission  (ORASECOM)  and  therefore  has  rights  to  the  waters  of  the  basin  in  terms  of  the  agreement  that  establishes  ORASECOM. Botswana’s proposal is to annually draw up to maximum of 5 million m3 of water from  the Vaal, and to deliver this to the villages in the extreme southwest of the country through the Vaal‐ Gamagara  Water  Transfer  Scheme.  The  scheme  will  involve  the  construction  of  cross‐border  water  transfer  infrastructure  over  an  estimated  distance  of  400  km.  It  is  assumed  that  no  dam  will  be  constructed,  but  water  will  be  stored  in  ground  tanks  at  appropriate  locations  along  the  400  km  pipeline. It is further estimated that 50 000 people will be served with safe domestic water supply  and sanitation services     The project proponent is the Department of Water Affairs, Botswana. The next project development  stage  is  a  pre‐feasibility  study  to  be  completed  in  2013.  This  requires  US$400  000.  Thereafter,  feasibility studies will be carried out in 2014. Detailed designs and tendering for construction will be  done in 2015. Implementation and construction of the associated project components is expected to  start in 2016 and will be completed in 2017.     The estimated total project costs are US$175 million, and a possible financier is KfW. The project can  be considered to be in Phase 2 of the ICA Project Development Phases.    The  major  project  challenges  are  the  timely  sourcing  of  project  finances  and  possible  failure  of  Botswana to access the Orange‐Senqu waters due to lack of agreement with other riparian states.    Ressano Garcia Weir (Project XB‐3)  Under the Inco‐Maputo Agreement (IMA) between Mozambique, South Africa and Swaziland, it was  agreed  to  release  a  minimum  cross‐border  flow  by  the  two  upstream  countries  amounting  to  2.6  m3/s  on  average  over  a  three‐day  period.  The  gauging  methods  used  on  both  sides  of  the  border  provide data that is not consistent with each other, resulting in disputes and the non‐compliance of    59

Select target paragraph3