Project title   Monitor  water  pollution  in  reservoirs  and  rivers  of  shared  watercourses  of  SADC  (Project GP‐9)  Project sponsors  The Secretariats of the SADC RBOs or the SADC Water Division where such Secretariats  do not exist.  Participating countries  All SADC Member States  Objectives   To inform on the level of the water quality of the SADC water resources;   Identify  the  polluters,  sources  of  pollution  and  pollution  “hot  spots”  to  enable  corrective action to be taken;   To  improve  data  sharing  among  the  riparian  states  of  the  SADC  shared  watercourses.  Project description  The SADC region has witnessed increased developments in the mining and irrigation  sectors in recent years. The planning and implementation of these developments has  occurred with little or no coordination among stakeholders in the neighbouring states  sharing  watercourses.  The  concomitant  environmental  impacts  characterised  by  increasing  levels  of  water  pollution  have  also  never  been  addressed  at  river  basin  level.     While this proposed project is not an infrastructure development project per se, it is  an  initiative  that  will  inform  the  extent  to  which  the  development  and  utilisation  of  water resources linked infrastructure will and has had in each of the 15 SADC shared  watercourses.  Polluted  water  is  more  expensive  to  use  as  it  requires  treatment.  In  some  cases  reservoir  waters  become  unusable,  with  negative  consequences  to  ecosystems and the environment. Further, the polluters and the “hot spots” in respect  of  pollution  will  be  identified  and  highlighted  facilitating  corrective  action.  The  data  collected  on  water  resources  management  and  pollution  will  also  be  of  great  importance  in  the  debates  on  equitable  water  allocation  across  all  user  sectors  in  these shared watercourses. Critical aspects to be monitored and reported on include  water  pollution,  soil  loss  and  sustainable  development.  Data  sharing  among  the  riparian states will be imperative if sustainable water resources management is to be  achieved in these shared watercourses.   Expected results  Details of pollution sources, polluters and pollution “hot spots” that will assist in the  better management of the shared watercourses, improvement in the water quality of  the SADC surface and ground waters, as well having sufficient information to enforce  pollution control regulations.   Ongoing  related  activities  in  the  This project is similar to the Limpopo River Basin Monitoring Project (Project P1‐2).  region   Description of national plan to the  It is expected that all SADC Member States will participate in this project through their  project  national institutions that have the water pollution control responsibility.  Status  The  project  can  be  considered  to  be  in  Phase  3  of  the  ICA  Project  Development  Phases.  Next steps  ToR  for  the  project  and  identification  of  polluters  and  “hot  spots”  should  be  completed in 2013. Detailed designs and tendering for construction for any necessary  monitoring  stations  will  then  be  done  in  2014.  Procurement  of  equipment  and  instruments and the construction of the monitoring stations would then start in 2015  and be completed by 2016. Monitoring and reporting would commence thereafter.   Business model  This  is  a  study,  with  infrastructure  requirements  being  the  construction  of  water  quality monitoring stations.  Main parties in place  The  departments  with  the  water  quality  responsibility  in  each  of  the  SADC  shared  watercourse riparian states, as well as the appropriate RBO Secretariat.  Main parties to be procured  Possible project financiers are Sida, the African Water Facility, UNEP and GEF.  Project challenges  The  major  project  challenges  are  the  timely  sourcing  of  project  finances,  as  well  as    96

Select target paragraph3