Water Supply and Sanitation at 12 Border Locations (Project XB‐5)  This project is expected to construct 6 000 boreholes and rehabilitate 3 500 boreholes and wells by  2015,  and  improve  the  existing  water  supply  and  sanitation  services  at  these  12  locations.  Under  sanitation, 310 000 latrines will be constructed. The towns and their border locations are: Kazungula‐ Kasane  (Zambia‐Botswana),  Siavonga‐Kariba  (Zambia‐Zimbabwe),  Luangwa‐Zumbo‐Kanyemba  (Zambia‐Mozambique‐Zimbabwe), Chanje‐Maluera (Zambia‐Mozambique), Chipata‐Mchinji (Zambia‐ Malawi),  Nakonde‐Tunduma  (Zambia‐Tanzania),  Mpulungu‐Kasanga‐Mutungu  (Zambia‐Tanzania‐ DRC), Nchelenge‐Kilwa (Zambia‐DRC), Kalabo‐Mussuma (Zambia‐Angola), Kasumbalesa‐Kasumbulesa  (Zambia‐DRC) and Chavuma‐Caripande (Zambia‐Angola).     The  project  will  undertake  new  investments,  as  well  as  the  rehabilitation  of  water  supply  and  sanitation facilities in the cross‐border towns. New protected wells, boreholes and VIP latrines will be  constructed  during  the  project  period.  Existing  water  supply  and  sanitation  facilities  that  are  not  functioning  properly  will  be  rehabilitated.  This  will  ultimately  increase  access  to  safe  water  and  sanitation services, which is currently low in these border towns. The project will also serve regional  tourism  and  transport,  and  mitigate  cross‐border  water  borne  diseases  in  the  border  towns  and  surrounding areas.    The 6 000 boreholes will serve an estimated 720 000 people, while the 3 500 rehabilitated boreholes  will  serve  an  estimated  420  000  people.  The  310  000  latrines  will  serve  an  estimated  1 860 000  people.  Some  of  the  cross‐border  locations  like  Siavonga‐Kariba  have  piped  water  supply  and  sanitation services. It is estimated that a total of 250 000 people will benefit from the expansion and  rehabilitation of such existing water supply and sanitation services carried under this project.    The project proponent is the Government of Zambia, which has to collaborate with the other project  riparian states of DRC, Tanzania, Malawi, Mozambique, Zimbabwe and Angola. Pre‐feasibility studies  and a comprehensive environmental and social impact assessment need to be completed by 2013,  after consensus on the project is achieved with the other project riparian states. Feasibility studies  would  then  follow  in  2014.  Detailed  designs  and  tendering  for  construction  will  be  done  in  2015.  Implementation and construction of the associated project components is expected to start in 2016  and will be completed by 2020.     The estimated total project costs are US$165 million. The project can be considered to be in Phase 1  of the ICA Project Development Phases. Possible project financiers are��UNICEF, KfW, Water Aid and  DANIDA.    The  major  project  challenges  are  the  timely  sourcing  of  project  finances,  as  well  as  achieving  consensus on the project with the project riparian states.     Lubango Phase II Water Supply and Sanitation Project (Project P1‐1)  The  principal  purpose  of  this  project  is  to  rehabilitate  and  extend  the  water  supply  and  sanitation  system of Lubango, considered the second largest city in Angola. The urgent reconstruction works for  water supply and sanitation are needed as a basic requirement for the development of the city and  surrounding areas. The project will supply 70 litres/person/day of domestic water supply to a total of  1 200 000 residents of Lubango.    The project proponent is the Ministry of Energy and Water in Angola. Feasibility studies for Phase II  of the Lubango Project should commence in 2012 and be completed by 2013. Detailed designs and  tendering for construction will be done in 2014. Implementation and construction of the associated  project components is expected to start in 2015 and will be completed by 2016.       61

Select target paragraph3