Project title   Movene Dam (Project P1‐7)  Project sponsors  The  project  proponent  is  the  National  Directorate  of  Water  (DNA)  and ARA  South  in  Mozambique being the project's implementing agent.  Participating countries  Mozambique  Objectives  To store water for human consumption, irrigation and livestock, contributing to socio‐ economic development, poverty eradication and food security.   Project description  The  dam  will  be  instrumental  in  poverty  eradication,  as  the  water  supply  from  the  dam will assist small‐holder farmers in Mozambique, as well as provide much needed  water  for  mainly  the  peri‐urban  population  with  poor  water  supply  and  sanitation.  The dam would supplement the existing Pequenos Limbobos Dam.     The selection of a concrete dam is motivated by the occurrence of flash floods in the  area, and the dam is proposed to be constructed as an overflow weir without gates.  6  3 The active storage volume would be about 50 x 10 m .    It is estimated that the project will supply 50 000 people with a safe water supply and  sanitation  service,  irrigate  300  hectares  of  land  and  generate  about  10  MW  of  hydropower.   Expected results  This project aims at construction of the Movene Dam, which will have a great impact  on the socio‐economic development of the surrounding area, namely:     Increase the water availability for human consumption and livestock;   Promote  the  irrigated  agriculture,  increasing  the  agricultural  production  and  productivity, thereby contributing to food security;   Increase in rural household income due to the high crop yields; and    Reduce  the  vulnerability  to  droughts  in  area  of  the  project;  contributing  to  maintenance of ecological flows.    The dam will be instrumental in poverty eradication as the water supply from the dam  will assist smallholder farmers in Mozambique  Ongoing  related  activities  in  the  Similar efforts in other SADC Member States pursuant to meeting the MDG targets on  region   water supply and sanitation services.  Description of national plan to the  A priority project for Mozambique requiring external financing.  project  Status  The  project  can  be  considered  to  be  in  Phase  1  of  the  ICA  Project  Development  Phases.  Next steps  Pre‐feasibility  studies  and  a  comprehensive  environmental  and  social  impact  assessment need  to  be  completed  by  2013.  Feasibility  studies  would  follow  in  2014.  Detailed designs and tendering for construction will be done in 2015. Implementation  and  construction  of  the  associated  project  components  is  expected  to  start  in  2016  and will be completed by 2018.   Business model  Investment project financed as a BOT, Grants or from Loans.  Main parties in place  DNA and ARA Sul  Main parties to be procured  Possible project financiers are USAID and the World Bank.  Project challenges  The major project challenge is the timely sourcing of project finances.     118

Select target paragraph3