Project title   Songwe River Basin Development Programme (Project RG‐4)  Project sponsors  The project proponents are the Governments of Malawi and Tanzania.  Participating countries  Malawi and Tanzania  Objectives  The  overall  goal  of  the  Songwe  River  Basin  Development  Programme  (SRBDP)  is  to  contribute  to  improved  living  conditions  of  the  basin  population  and  the  socio‐ economic  development  in  Malawi  and  Tanzania.  The  specific  objective  is  to  prepare  designs and joint investment projects for implementation, and to create an effective  enabling  environment  for  trans‐boundary  water  resources  management  in  the  Songwe River Basin through the creation of the Songwe River Basin Authority.  Project description  The project is structured in five components:     Preparation of a shared vision towards 2050 and a ten‐year SRBDP;   Detailed design and preparation of priority investments as a major task;   Environmental  and  social  safeguarding  of  the  SRBDP  by  means  of  a  strategic  environmental  and  social  assessment  and  environmental  and  social  impact  assessment for the programme;   Establishment of a Songwe River Basin Authority and associated IWRM capacity  building at local level; and   Support  to  project  management  and  resource  mobilisation  for  the  implementation of capital investments under the programme.    In  respect  of  water  sector  infrastructure  development  projects,  the  SRBDP  will  6 3 construct  the  lower  dam  with  a  capacity  of  10  x  10   m ,  which  will  irrigate  some  200 ha and also generate about 153 MW. It is estimated that the project will benefit  some 250 000 people who will have improved water supply and sanitation services.  Expected results  The  construction  of  a  dam  to  irrigate  200  ha  of  land  and  generate  153  MW  to  the  benefit of some 250 000 people who will have improved water supply and sanitation  services.  Ongoing  related  activities  in  the  Sida  has  facilitated  initial  meetings  in  the  two  riparian  states,  with  the  AfDB  having  region   provided grant funds for feasibility studies in 1994.  Description of national plan to the  Each country to nominate and mandate existing institutions to spearhead the project  project  for final handover to the Songwe River Basin Authority once created.  Status  The  project  can  be  considered  to  be  in  Phase  4  of  the  ICA  Project  Development  Phases.  Next steps  The  next  project  development  stage  is  final  designs  to  be  conducted  from  2012  to  2013 and tendering for construction in 2014. Implementation and construction of the  associated  project  components  is  expected  to  then  start  in  2015  and  will  be  completed in 2021.   Business model  Investment project financed as a BOT, grants or from loans.  Main parties in place  Governments of Malawi and Tanzania  Main parties to be procured  Possible project financiers are the AfDB, Sida and the WB.   Project challenges  The major project challenges include:       Obtaining final approval to proceed with the project from both governments;   Timely sourcing of project finances;   The establishment of the Songwe River Basin Authority, which will take time but  will  contribute  to  the  consolidation  of  the  good  cooperation  between  the  two  104

Select target paragraph3