Project title   Reduction in non‐revenue water and water losses in the Capital Cities of the SADC  Member States (Project GP‐8)  Project sponsors  The  project  proponents  are  the  SADC  Member  States,  with  the  water  utilities  for  each capital city being the implementing agency.  Participating countries  All SADC Member States  Objectives  The  objectives  of  this  project  are  to  reduce  the  water  demand  of  water  users  by  reducing water losses and NRW, achieve greater water use efficiency, increased water  re‐use  and  use  of  appropriate  metering,  monitoring  and  data  analysis  methods  to  document volumes delivered/provided and used.  Project description  This  is  an  investment  opportunity  study.  This  project  will  assess  the  level  of  NRW,  water losses and water re‐use in all the 15 capital cities of the SADC Member States  and recommend appropriate actions to be taken for each city. The objectives of this  proposed project are similar to those of Projects P1‐9 and P1‐10, which are to reduce  the water demand of water users by reducing water losses and NRW, achieve greater  water use efficiency and use of appropriate metering, monitoring and data analysis  methods to document volumes delivered/provided and used.  Expected results  The resultant water savings can be used to supply new consumers. Revenue streams  would  improve  as  the  water  supply  systems  would  be  more  efficient.  The  management of the water situation in all the 15 capital cities of the SADC Member  States can be improved by applying water demand management (WDM) principles.  Activities  such  as  pipe  leakage  repair,  pressure  reduction,  re‐use  of  water  and  metering with commensurate data analysis can be introduced with good results and  resultant  benefits  to  the  consumers  being  serviced.  Water  conservation  and  water  demand management measures will provide cost effective means of reducing water  demands in the long run, by minimising losses and wastage and by so doing, delaying  the need to construct additional infrastructure, usually at higher capital cost. In any  case,  why  build  new  infrastructure  when  similar  old  infrastructure  cannot  be  efficiently managed?  Ongoing  related  activities  in  the  A study by the South African Water Research Commission some years ago estimated  region   the total physical water losses for some 62 urban systems analysed by the study to be  in  the  order  of  31%  of  the  total  water  supplied.  Adding  unbilled  consumption,  the  study estimated NRW for the 62 systems at around 36% of the water supplied. The  results from the study have been quoted extensively and are considered one of the  most reliable sources of quantifying water losses in South Africa. South Africa’s 36%  is similar to the world average, however South Africa is classified as a water stressed  area  and  cannot  afford  to have such  high  levels  of  water  losses  and NRW.  Globally,  NRW  ranges  considerably,  with  Albania  and  Ecuador  having  more  than  70%  compared  to  Australia,  New  Zealand,  Cambodia  and  Singapore  each  attaining  less  than 10% NRW.  Description of national plan to the  Implementing the overall WDM programmes in all SADC Member State capital cities  project  as a pilot project can later be replicated in the other Member States towns and cities,  resulting in great savings, higher revenue streams from an increased customer base  as well more efficient water supply service systems.  Status  The  project  can  be  considered  to  be  in  Phase  4  of  the  ICA  Project  Development  Phases.  Next steps  The project would start with the drafting of the ToR for the project in 2013, tendering  for  the  consultancy  work  in  2013  and  execution  of  the  project  in  2014.  Project  profiles  for  each  city  would  then  be  produced  for  the  mitigatory  works  and  associated costs.  Business model  This  is  a  capacity  enhancement  project,  with  minimal  initial  Water  Sector  developmental  infrastructure.  However,  the  project  will  facilitate  the  reduction  in  water losses, resulting in improved revenue for the utilities and thus delaying, where  appropriate, the need for new Water Sector infrastructure.   Main parties in place  The  SADC  Water  Division  and  the  water  utilities  for  each  capital  city  of  the  SADC  Member States.    89

Sélectionner le paragraphe cible3