164
sufficient duration to permit commercial extraction of
minerals of the area and should include a reasonable time
period for construction of commercial-scale mining and
processing systems, during which period commercial
production should not be required. The total duration of
exploitation, however, should also be short enough to give
the Authority an opportunity to amend the terms and
conditions of the plan of work at the time it considers
renewal in accordance with rules, regulations and
procedures which it has adopted subsequent to approving
the plan of work.
(c) Performance requirements:
The Authority shall require that during the exploration
stage periodic expenditures be made by the operator which are
reasonably related to the size of the area covered by the plan of
work and the expenditures which would be expected of a
bona fide operator who intended to bring the area into
commercial production within the time-limits established by the
Authority. The required expenditures should not be established
at a level which would discourage prospective operators with
less costly technology than is prevalently in use. The Authority
shall establish a maximum time interval, after the exploration
stage is completed and the exploitation stage begins, to achieve
commercial production. To determine this interval, the
Authority should take into consideration that construction of
large-scale mining and processing systems cannot be initiated
until after the termination of the exploration stage and the
commencement of the exploitation stage. Accordingly, the
interval to bring an area into commercial production should take
into account the time necessary for this construction after the
completion of the exploration stage and reasonable allowance
should be made for unavoidable delays in the construction
schedule. Once commercial production is achieved, the
Authority shall within reasonable limits and taking into
consideration all relevant factors require the operator to
maintain commercial production throughout the period of the
plan of work.
(d) Categories of resources:
In determining the category of resources in respect of
which a plan of work may be approved, the Authority shall give
emphasis inter alia to the following characteristics:
(i) that certain resources require the use of similar mining
methods; and
(ii) that some resources can be developed simultaneously
without undue interference between operators developing
different resources in the same area.
Nothing in this subparagraph shall preclude the Authority from
approving a plan of work with respect to more than one
category of resources in the same area to the same applicant.
(e) Renunciation of areas:
The operator shall have the right at any time to renounce
without penalty the whole or part of his rights in the area
covered by a plan of work.