2.   GRZ/MTENR, 2010. National Climate Change Response Strategy (NCCRS), Ministry  of  Tourism,  Environment  and  Natural  Resources  (MTENR),  Lusaka,  p.20‐21.  /  NCCRS FIRST DRAFT 15TH SEPTEMBER 2010.pdf  3.   GRZ/MACO, 2010. Water for Agriculture and Energy: National Investment Profile  of  Zambia.  Ministry  of  Agriculture,  Lusaka.  p.50./ZWP  Consolidated  Report.  August 2010 version 5[2].doc  4.   Signature  page:  GRZ/UNDP,  2009.  Adaptation  to  the  effects  of  drought  and  climate change in Agro‐ecological regions I and II.  Intervention requiring financing  Project to be presented for grant financing during the planned 1st SADC Infrastructure  Investment Summit and Conference to be held in the last quarter of 2012.  Revenues for financing repayment  This  is  a  study  that  will  end  with  an  informed  position  to  facilitate  the  efficient  management of other��climate change projects in the SADC region.   Estimated total cost  The  estimated  total  cost  for  the  project  monitoring  over  the  four  years  is  US$0.5 million.   Execution period  After project funding is secured in 2012 and the drafting of the ToR and procurement  of a consultant in 2013, the project will be executed from 2014 and be completed in  2017.       95

Sélectionner le paragraphe cible3