sourcing of funds (US$5 million) and tendering for construction for Phase 2B will be done in 2013.  The  execution  of  the  associated  project  components  is  expected  to  start  in  2014  and  will  be  completed by 2015. Final designs, sourcing of funds (US$50 million) and tendering for construction  for Phase 3 (construction of pump stations, pump houses, recharge and abstraction installations) will  be done in 2014, bearing in mind the results of the borehole production tests carried out in Phase  2B. Execution of Phase 3 will commence in 2015 and be concluded by 2020.     The estimated total project costs are US$55 million. The project can be considered to be in Phase 5 of  the ICA Project Development Phases. Possible project financiers are the World Bank and AfDB.    The major project challenges are the timely sourcing of project finances, and the possible pollution  of the stored underground water. The pollution risk will need to be addressed as part of the project.    Reducing Non‐revenue Water and Increasing Use Efficiency (Project P1‐9)  The water supply situation in the Seychelles needs rapid improvement. Water shortages occur mainly  during annual dry periods. Water restrictions are common on the three main islands of Mahé, Praslin  and La Digue. Demand for potable water is continuously rising from population growth, tourism and  other  commercial  developments.  The  islands’  topography  precludes  sufficient  storage  capacity  at  economic costs from the traditional sources of fresh water from streams. It is thus necessary that a  project  that  results  in  the  reduction  of  water  supply  leakages  and  increased  efficiency  in  water  distribution and usage be implemented.     The project, which will be undertaken on the three islands in the next five years, relates to reducing  the  amount  of  NRW  and  putting  effective  instrumentation  in  place.  These  actions  would  allow  greater  efficiency  in  distribution  and  increased  availability  for  use,  as  well  as  collecting  the  logical  volumetric monitoring data using telemetries to more accurately determine the quantities of water  being distributed. Implementing the overall water development projects will have a beneficial impact  on the socio‐economics of the Seychelles.     The additional population to be served from the savings arising from the reduction in NRW is 25 000  people.     The project proponent is the Public Utilities Corporation. Detailed designs are being undertaken by  the  Public  Utilities  Corporation  and  will  be  completed  by  the  end  of  2012.  Sourcing  of  funds  and  tendering for construction will be done in 2013. Implementation and construction of the associated  project components is expected to start in 2014 and will be completed by 2015.     The estimated total project costs are US$26 million. The project can be considered to be in Phase 4 of  the  ICA  Project  Development  Phases.  Possible  project  financiers  are  the  African  Water  Facility  and  USAID.    The major project challenge is the timely sourcing of project finances for construction.     Nondvo Multi‐purpose Dam (Project P1‐11)  The purpose of the project is to provide potable water to the residents of Mbabane and Manzini in  Swaziland.  The  Nondvo  Multi‐purpose  Dam,  located  on  the  Lusushwana  River,  has  a  potential  to  improve  the  water  resources  situation  in  the  two  cities,  which  are  both  currently  operating  at  full  supply  capacity.  The  Nondvo  Multi‐purpose  Dam  would  have  a  full  supply  level  capacity  of  150  x  106 m3.  This  dam  has  a  potential  to  generate  50  MW.  The  water  stored  in  the  dam  will  be  able  to  meet the water supply and sanitation needs of an additional 100 000 people.      65

Sélectionner le paragraphe cible3