The estimated total project costs are US$120 million. The project can be considered to be in Phase 3  of  the  ICA  Project  Development  Phases.  Possible  project  financier  is  the  German  Credit  Agency,  Ausfurkredltgeschaft.    The major project challenge is the timely sourcing of project finances.     Kinshasa Water Supply and Sanitation (Project P1‐3)  The  drinking  water  supply  system  of  Kinshasa  has  substantial  constraints  mainly  due  to  the  poor  distribution network and the age of the electrical and reticulation systems. After the capacity of the  city’s  water  supply  is  increased,  the  rehabilitation  and  strengthening  of  the  water  supply  and  sanitation  networks  will  follow,  contributing  to  the  improvement  of  life  of  the  population.  Water  supply  production  will  be  increased  to  800  000  m3/day.  It  will  also  be  necessary  to  rebuild  the  network for  all nine  municipalities linked to Kinshasa. This water supply and  sanitation  project will  serve an estimated 10 million people.    The project proponent is the Ministry of Energy, DRC with REGIDESO being the implementing agent.  Feasibility studies for the project, requiring about US$10 million, should commence in 2013 and be  completed  by  2014.  Detailed  designs  and  tendering  for  construction  will  be  done  in  2015.  Implementation and construction of the associated project components is expected to start in 2016  and be completed by 2020.     The estimated total project costs are US$220 million. The project can be considered to be in Phase 3  of  the  ICA  Project  Development  Phases.  Possible  project  financiers  are  Chinese  and  South  Korean  banks.    The major project challenge is the timely sourcing of project finances.     Lesotho Lowlands Water Supply Scheme – Zone 1 (Project P1‐4)  The  project  will  supply  Botha‐Bothe  and  adjacent  villages  with  domestic  water.  The  project  is  designed in such a way, that treated water will be delivered to bulk storage reservoirs from where the  settlements will be supplied. The strategic storage will provide reliability during system repairs and  power outages. Future expansions are provided for in the design of the project. Where possible, the  expansion  will  be  through  modular  design,  e.g.  twining  storage,  modular  treatment  works  and  pumping stations. In essence, the facilities can��be easily upgraded by adding more components. The  existing infrastructure will be integrated where appropriate or possible, but where the systems are  very  small  or  old/unreliable,  these  will  be  superseded  by  the  project  infrastructure.  The  infrastructure  to  be  developed  will  provide  water  for  drinking  and  sanitation  to  Botha‐Bothe  and  adjacent villages. This is planned to benefit a total of 127 000 people by the year 2027. Ensuing from  the  project  will  be  socio‐economic  and  health  benefits  to  the  target  population  in  the  area.  The  project will also ease the water demand pressures from the industrial firms in Botha‐Bothe, with the  additional  employment  further  benefitting  the  town’s  population.  It  is  estimated  that  the  total  surface water storage to be created for this project will be 100 x 106 m3.    The  project  proponent  is  the  Lesotho  Highlands  Water  Commission.  Feasibility  studies  as  well  as  detailed  designs  are  complete.  The  next  stage  is  sourcing  finances  and  tendering  for  construction,  which  should  be  completed  by  2013.  Implementation  and  construction  of  the  associated  project  components is expected to start in 2014 and will be completed by 2017.     The estimated total project costs are US$78 million. The project can be considered to be in Phase 5  of the ICA Project Development Phases. Possible project financiers are DBSA and AfDB.      62

Sélectionner le paragraphe cible3