work in 2013 and execution of the project from 2014 to 2020. Possible project financiers are DBSA,  GEF and GIZ. The project can be considered to be in Phase 3 of the ICA Project Development Phases.    The major project challenges foreseen are the timely sourcing of project finances and the adoption  of an MoU between the dam operators to facilitate conjunctive and synchronised operation of dams,  as well as information exchange.    Implications of virtual water trading in water resources development and usage in the SADC region  (Project GP‐11)  The  project  proponents  are  all  the  SADC  Member  States,  with  the  SADC  Water  Division  being  the  lead  agency.  Virtual  water (also  known  as embedded  water, embodied  water  or hidden  water)  refers, in the context of trade, to the water used in the production of goods or services. Virtual water  trade  in  practice  means  that  a  country  can  potentially  mitigate  its  water  shortages  by  importing  large amounts of virtual water, instead of building new water supply infrastructure. For instance, it  takes 1 300 m3 of water on average to produce one metric tonne of wheat. The precise volume can  be more or less, depending on climate conditions and agricultural practices. By importing 100 000  tonnes  of  wheat  a  year,  a  water  scarce  country  has  actually  imported  130  million  m3of  water  per  year, a very large yielding dam indeed. At the same time, such agricultural exports from water rich  countries could be drivers for economic growth.     A project that brings better understanding to the implications of virtual water among Member States  of SADC and between SADC and the other African  RECs should be undertaken. The  project would,  among  other  outputs,  propose  virtual  water  trade  strategies  for  both  water  scarce  and  water  rich  SADC Member States for their mutual benefit, and highlight the water infrastructure requirements  for the proposed water trade strategies.     It is estimated that the total cost of the project would be US$1 million. The project would start with  the  drafting  of  the  ToR  for  the  study  in  2013,  tendering  for  the  consultancy  work  in  2013  and  execution of the project in 2014. Possible project financiers are DBSA, GEF and the AfDB. The project  can be considered to be in Phase 4 of the ICA Project Development Phases.    The major project challenge foreseen is timely sourcing of project finances.  Investment Projects    There  are  21  investment  projects  which  have  been  included  in  the  Water  Sector  RIDMP:  Inga  III  Hydropower,  Lesotho  Highlands  Phase  II,  Batoka  Gorge  Hydroelectric  Scheme,  Songwe  River  Basin  Development  Project,  Vaal‐Gamagara  Water  Supply,  Ressano  Garcia  Weir,  Lomahasha/Namaacha  Water Supply, Water Supply and Sanitation to 12 Border Locations, Water Supply and Sanitation for  Lubango Phase II, Water Supply and Sanitation for Kinshasa, Lesotho Lowlands Water Supply Scheme  Zone  1,  Mombezi  Multipurpose  Dam,  Water  Supply  and  Sanitation  to  13  Housing  Estates,  Movene  Dam, Artificial Recharge of Windhoek Aquifer Phases 2B and 3, Reducing NRW and Increasing Water  Use  Efficiency,  Nodvo  Multipurpose  Dam,  Ruhuhu  Valley  Irrigation  Scheme,  Climate  Change  Adaptation  to  Drought  Agro‐region  1,  Bulawayo‐Zambezi  Water  Supply  Scheme  and  Improved  Agricultural Water Application Efficiencies.    Inga III Hydropower (Project RG‐1)  Besides meeting the internal energy needs of the DRC and the BHP Billiton aluminium smelter, excess  power  from  the  Inga  III  Hydropower  project  will  be  exported  to  the  SADC  region.  No  dam  will  be  constructed for the Inga III Hydropower project. Water will be diverted from the Congo River through  tunnels to the power station. The nominal power station production capacity will be 4 320 MW (16 x    56

Sélectionner le paragraphe cible3