Project title   Kinshasa Water Supply and Sanitation (Project P1‐3)  Project sponsors  The  project  proponent  is  the  Ministry  of  Energy,  DRC  with  REGIDESO  being  the  implementing agent.  Participating countries  DRC  Objectives  To supply water and sanitation services for municipalities of Kinshasa.  Project description  The drinking water supply system of Kinshasa has substantial constraints mainly due  to  the  poor  distribution  network  and  the  age  of  the  electrical  and  reticulation  systems.  After  the  capacity  of  the  city’s  water  supply  is  increased,  the  rehabilitation  and strengthening of the water supply and sanitation networks in the city will follow,  contributing  to  the  improvement  of  life  of  the  population.  Water  supply  production  will be increased to 800 000 m3/day. It will also be necessary to rebuild the network  for all nine municipalities linked to Kinshasa.    This water supply and sanitation project will serve an estimated 10 million people.  Expected results  This  project  will  significantly  improve  the  living  standards  of  the  population  of  Kinshasa  by  improving  the  health  of  a  population,  which  is  suffering  from  habitual  water shortages.  Ongoing  related  activities  in  the  Similar efforts in other SADC Member States pursuant to meeting the MDG targets on  region   water supply and sanitation services.  Description of national plan to the  Priority of DRC Government, with no certain funding identified to date.  project  Status  The  project  can  be  considered  to  be  in  Phase  3  of  the  ICA  Project  Development  Phases.  Next steps  Feasibility studies for the project, requiring about US$10 million, should commence in  2013 and be completed by 2014. Detailed designs and tendering for construction will  be  done  in  2015.  Implementation  and  construction  of  the  associated  project  components is expected to start in 2016 and be completed by 2020.   Business model  Investment project financed as a BOT, grants or from loans.  Main parties in place  REGIDESCO  Main parties to be procured  Possible project financiers are Chinese and South Korean Banks.  Project challenges  The major project challenge is the timely sourcing of project finances.   Project documentation available  1. Réhabilitation  et  renforcement  du  réseau  de  distribution  d’eau  potable  de  Kinshasa REGIDESO/DG. Novembre 2004. Requête de financement pour le réseau  de la ville de Kinshasa.  2. Etude ICEA MAZRS. Juillet 2007.  3. Etude  régionale  du  Plan  de  Développement  du  secteur  de  l’eau  potable  et  de  l’assainissement  (1991‐2010).  Alimentation  en  eau  potable  de  Kinshasa.  OTUI.  Octobre 1991.  Intervention requiring financing  Project  to  be  presented  for  financing  during  the  planned  1st  SADC  Infrastructure  Investment Summit and Conference to be held in the last quarter of 2012.  Revenues for financing repayment  This  is  an  infrastructure  investment  project,  which  will  raise  sufficient  revenue  to  repay any loans procured for implementing the project.   Estimated total cost  The estimated total project costs are US$220 million.   Execution period  After project funding is secured in 2012, the project will be undertaken from 2013 to  2020.       113

Sélectionner le paragraphe cible3