Project title   Piloting  synchronised  and  conjunctive  operation  of  dams  for  flood  and  drought  mitigation, improved energy generation and livelihoods and provision of water for  the environment in the Zambezi River Basin (Project GP‐10)  Project sponsors  The  project  proponent  is  the  ZAMCOM  Secretariat  with  the  dam  operators  of  the  Kariba, Itezhi‐Tezhi, Kafue and Cahora Bassa dams being the lead and implementing  agencies.  Participating countries  Mozambique, Zambia and Zimbabwe  Objectives   To demonstrate the benefits of conjunctive and synchronised dam operations  in  respect  to  increased  hydropower  generation,  flood  and  drought  control,  improved  riparian  livelihoods  and  the  provision  of  water  to  meet  environmental needs; and   To build confidence in synchronised and conjunctive operation of dams, while  providing  valuable  lessons  and  experiences  for  improvements  and  future  replication in other SADC river basins.  Project description  The major dams of the Zambezi River Basin have, to date, generally been operated  independently,  without  regard  to  the  requirements  of  other  stakeholders.  Except  for the Kafue dams, all the other dams have been managed without any provision  for environmental flows and other socio‐economic considerations for downstream  or other riparian users. Floods and droughts are part of the history of the Zambezi  with and without dams. Dams impound floods and modify downstream flows and  the  lake  environment.  However,  releases  can  be  managed  to  minimise  upstream  and  downstream  impacts  (SADC  2011).  The  need  to  widen  the  range  of  possible  flow regimes in the Zambezi River system downstream and upstream of major dams  in  order  to  provide  for  more  uses/users  was  established  during  the  Zambezi  Dam  Synchronisation  and  Flood  Releases  Study  (SADC  2011).  The  goals  of  system  optimisation,  water  security  and  benefit  sharing  were  also  discussed  in  detail.  Synchronisation  and  conjunctive  operation  are  two  terms,  which  are  very  closely  associated  with  modern  scientific  trends  in  dam  management  to  achieve  these  goals.  There  is  need  to  demonstrate  that  dam  synchronisation,  conjunctive  operation  of  dams  and  introduction  of  environmental  flows  in  the  Zambezi  River  Basin  is  achievable  and  beneficial.  Dam  operators  and  other  stakeholders  require  support to set up and implement a practical pilot project, which builds confidence  in  synchronised  and  conjunctive  operation  of  dams,  while  providing  valuable  lessons  and  experiences  for  improvements  and  future  replication  in  other  SADC  River Basins (SADC 2011).  Expected results  One of the expected outcomes of the pilot project would be that the dam operators  of the main dams in the Zambezi River Basin would negotiate and agree to operate  their  dams  for  optimal  outcomes,  which  include  addressing  flood  and  drought  management  and  environmental  flow  requirements.  Operating  the  Kariba  dam,  dams  on  the  Kafue  sub‐system  and  Cahora  Bassa  dam  in  a  conjunctive  and  synchronised manner would result in optimum hydropower production, dam safety,  supply  of  water  to  other  users,  including  the  environment,  and  reduced  flood  damage upstream and downstream of these major dams.  Ongoing  related  activities  in  the  This will be one of the first such full‐scale pilot projects in SADC region.  region   Description  of  national  plan  to  the  The dam operators of the Zambezi River Basin will be the focus implementers of this  project  project in consultation with their parent government ministries.  Status  The  project  can  be  considered  to  be  in  Phase  3  of  the  ICA  Project  Development  Phases.  Next steps  The expected next stages for this pilot project would be:       Undertaking a feasibility study for the pilot project;   Implementation  of  a  pilot  project  involving  Kariba,  dams  on  the  Kafue  sub‐ system  and  Cahora  Bassa  Kariba  dam,  dams  on  the  Kafue  sub‐system  and  98

Sélectionner le paragraphe cible3