Project title   Monitoring  Climate  Change  Adaptation  to  Drought  –  Agro‐ecological  Region  I,  Zambia (Project GP‐6)  Project sponsors  The  project  proponent  is  the  SADC  Water  Division,  which  will  appoint  a  suitable  consultant or implementing agent such as the ZAMCOM Secretariat.  Participating countries  Zambia and the SADC Water Division  Objectives  It is important that Project P1‐13 has a strong monitoring component, especially for  lessons to be learnt in its implementation and applicability for replication in the SADC  region. This project will independently monitor Project P1‐13 to facilitate replication  in  similar  areas  of  the  SADC  region.  The  monitoring  project,  as  part  of  the  other  outputs,  will  recommend  other  areas  in  the  SADC  region  where  the  project  can  be  replicated with appropriate project profiles being developed.  Project description  The overall objective of the Climate Change Adaptation to Drought Project (P1‐13) is  to  reduce  the  vulnerability  of  those  depending  on  rain‐fed  agriculture  practices  to  anticipate rainfall shortages in the face of climate change/variability. Agro‐ecological  Region  (AER)  I  covers  the  western  and  southern  parts  of  Zambia  and  receives  less  than  800  mm  of  rain  annually.  Project  P1‐13  will  focus  on  the  introduction  of  irrigation  and  water  management  systems,  training,  capacity  building  of  farmers  on  water  management  practices,  support  to  marketing  and  the  provision  of  finance  credit  facilities.  It  will  also  cover  support  to  the  introduction  of  drought  resistant  crops  such  as  cassava,  beans,  sorghum,  millet,  potatoes,  vegetables  and  fruit  trees.  The project also entails the eventual construction of five dams at five selected areas  in  AER  I,  eight  fish  ponds  per  site  and  irrigation  schemes  at  these  five  separate  locations.    This  project,  Project  GP‐6,  will  monitor  the  implementation  of  Project  P1‐13  for  possible replication in other SADC Member States.  Expected results  Lessons  and  experiences  will  be  shared  and  the  project  could  be  replicated  in  other  SADC Member States.  Ongoing  related  activities  in  the  This  project  will  rely  on  the  implementation  of  Project  P1‐13,  which  is  to  be  region   implemented  in  Zambia.  Portions  of  Project  P1‐13  commenced,  but  progress  is  slow  due to financial and other constraints.  Description of national plan to the  Most  of  the  planning  has  already  been  complete  and  the  concepts,  and  ideas about  project  how to use the funds have been established as the basis for the development of this  water infrastructure project so far. In terms of the ICA guidelines, the project however  seems to be in Phase 2, as there is no evidence that any pre‐ or full feasibility study  was carried out at the specific locations where the infrastructure is planned. However,  the  areas  of  need  are  real  and  the  types  of  projects  that  are  likely  to  succeed  have  been  clearly  identified  and  funding  has  been  put  towards  their  development.  Therefore,  the  relevance  of  the  ICA  guidelines  to  this  project  is  not  considered  particularly high in terms of next project preparation steps.  Status  The  project  can  be  considered  to  be  in  Phase  3  of  the  ICA  Project  Development  Phases.  Next steps  The  ToR  and  appointment  of  the  consultant  can  be  done  in  2014,  in  time  to  start  monitoring Project P1‐13 in 2014 till 2017, as Project P1‐13 will be concluded in 2016.   Business model  This is a study.  Main parties in place  The Ministry of Agriculture in Zambia and the SADC Water Division.  Main parties to be procured  Possible project financiers are UNDP and the FAO.  Project challenges  The major project challenge foreseen is timely sourcing of project finances.  Project documentation available  1.   GRZ/UNDP,  2009.  Adaptation  to  the  effects  of  drought  and  climate  change  in  Agro‐ecological  regions  I  and  II.  (Project  IDS:  0085205/00072197  (ZMB10))  /  Zambia_11‐9‐09_Adaptation_Effects_Drought_CC_Zone1‐2.pdf  (with  GEF  assessment of protect potential and technical merit for support, p.1‐31).    94

Sélectionner le paragraphe cible3