Executive Summary    The  primary  objective of  the SADC Regional Infrastructure Development Master Plan  (RIDMP) is  to  define  the  minimum,  but  ultimate  regional/trans‐boundary  infrastructure  development  requirements and conditions to facilitate the implementation and realization by year 2027 of the key  infrastructure in the water, energy, transport, tourism, meteorology and telecommunication sectors  that  will  move  forward  the  SADC  Agenda  and  enable  the  SADC  region  to  realise  its  goal:  The  attainment of an integrated regional economy on the basis of balance, equity and mutual benefit for  all  Member  States.  The  SADC  goal  is  premised  on  the  three  key  objectives  of  poverty  eradication,  food security and economic development.    The key aims of infrastructure development include the following:    Providing  infrastructure  support  for  regional  integration  within  the  context  of  the  regional  economic integration agenda; and  Infrastructure  provision  for  poverty  eradication  through  enhanced  universal  access  to  water  supply and sanitation, transport, secure energy sources, communications and ICT, in order to  maximise  economic  development  and  attain  the  MDGs  targets,  as  the  SADC  region  seeks  to  address its overarching objective of reducing poverty.    The  RIDMP  also  constitutes  a  key  input  to  the  proposed  COMESA‐EAC‐SADC  Inter‐regional  Infrastructure Master Plan and the continental Programme for Infrastructure Development of Africa  (PIDA).     The  RIDMP  is  a  strategic  framework  document,  which  will  guide  the  implementation  of  efficient,  seamless  and  cost‐effective  regional/trans‐boundary  infrastructure  networks  in  an  integrated  manner in all the sectors (water, energy, transport, tourism, meteorology and telecommunication),  which  constitute  SADC’s  Regional  Infrastructure  Development  Programme.  The  RIDMP  defines  SADC’s strategy in terms of content and actions, which constitute a basis for priority setting, strategy  implementation  as  well  as  the  modus  operandi  for  implementation  of  the  RIDMP.  The  RIDMP  strategic  framework  provides  both  the  infrastructure  requirements  and  the  implementation  roadmap, Vision 2027 Water Sector targets that will be executed over a period of fifteen (15) years  planned from 2012 as: short‐term to 2017, medium‐term to 2022 and long‐term to 2027.    The current status of the water resources and related infrastructure development in the SADC region  can be summarised as follows:     Water  resources  significantly  vary  in  distribution,  availability  and  usage  across  the  SADC  region;   There is an estimated total of 2 300 km3/year of renewable water resources available to the  SADC region’s population of 260 million people (Aquastat 2011);    The current level of abstraction is only 44 km3/year or 170 m3/capita/year. Of the 44 km3/year  abstracted, 77% is used for irrigation, 18% for domestic purposes while 5% is used by industry  (Aquastat 2008);   If the storage of the Kariba and Cahora Bassa dams is excluded, only 4% of the total annual  renewable  water  resources  in  the  SADC  region  is  currently  stored  for  various  uses,  which  is  very low compared to 70‐90% in most industrialised countries (UNEP 2009);    If the storage of Kariba and Cahora Bassa dams is included, 14% of the total annual renewable  water resources in the SADC region is currently stored for various uses;    5

Sélectionner le paragraphe cible3