mainstreaming  of  adaptation  in  national  fiscal,  regulatory  and  development  policies  to  support  adaptive practices on a wider scale. The project will focus on the introduction of irrigation and water  management  systems,  training,  capacity  building  of  farmers  on  water  management  practices,  support  to  marketing,  and  provision  of  finance  credit  facilities.  It  will  also  cover  support  to  the  introduction of drought resistant crops such as cassava, beans, sorghum, millet, potatoes, vegetables  and fruit trees. An estimated total number of 7 629 families, covering all categories of farmers and  the  community  within  AER  I,  will  benefit  from  these  investments.  The  project  also  entails  the  construction  of  five  dams  at  five  selected  areas  in  AER  I,  eight  fish  ponds  per  site  and�� irrigation  schemes at these five separate locations.    It is estimated that the total capacity of the five dams will be 250 x 106 m3, which will irrigated a total  area of 3 000 hectares and supply an estimated population of  45 000 people with a safe domestic  water supply and sanitation service.     The  project  proponent  is  the  Ministry  of  Agriculture  and  Cooperatives  in  Zambia.  As  there  is  no  available documentation, feasibility studies should be carried out and be completed in 2013. Detailed  designs,  sourcing  of  funds  and  tendering  for  project  implementation  will  be  done  in  2014.  Implementation and construction of the associated project components is expected to start in 2015  and will be completed by 2016.     The estimated total project costs are US$80 million. The project can be considered to be in Phase 3 of  the ICA Project Development Phases. Possible project financiers are UNDP and the FAO.    The major project challenges are the timely sourcing of project finances, limited capacity within the  Ministry  of  Agriculture  and  Cooperatives  to  implement  strategies  of  the  National  Irrigation  Plan  in  Agro‐Ecological Region I, lack of political will and financial resources to invest in the identified areas.    Bulawayo‐Zambezi Water Supply Scheme (Project P1‐14)  Bulawayo is the second largest city in Zimbabwe, and has a population estimated at 1 million people  (2006). It is regarded as Zimbabwe’s industrial hub and is strategically located in a position with easy  access to Botswana through the Plumtree Border Post, to Zambia through Victoria Falls Border Post  and  to  South  Africa  through  the  Beitbridge  Border  Post.  Bulawayo  is  located  in  a  semi‐arid  region,  which is prone to droughts and, as such, water resources are limited. The city has been facing serious  water  shortages  for  a  long  period.  Many  initiatives  have  been  undertaken,  including  a  water  conservation  study  and  strategy  carried  out  and  developed  sometime  in  the  mid‐1990s.  Water  rationing is a common measure applied frequently by Bulawayo to minimise the effects of the limited  water  supply.  As  a  long‐term  strategy  to  solve  the  water  supply  problems  of  Bulawayo  and  the  Matabeleland  North  region,  the  Bulawayo‐Zambezi  Project,  was  proposed,  of  which  initial  works  were  carried  out  in  the  mid‐1990s.  This  project  aims  to  augment  the  water  supply  of  Bulawayo  in  two  approaches.  The  first  involves  the  construction  of  the  Gwayi‐Shangani  dam,  with  a  full  supply  level  capacity  of  634  x  106  m3  and  a  pipeline  from  the  dam  to  Cowdray  Park  in  Bulawayo  where  a  water  treatment  plant  and  a  reclamation  plant  will  be  constructed.  The  other  component  involves  the construction of a pipeline from the Zambezi River at Deka to Bulawayo by linking this line to the  one from Gwayi‐Shangani Dam at Kennedy Railway Siding.    An  additional  1  000  000  persons  will  benefit  from  improved  water  supply  and  sanitation  services,  while 6 500 ha will be put under irrigation from water from this project. It is also expected that the  Gwayi‐Shangani dam will be equipped to generate 20 MW.    The  project  proponent  is  the  Ministry  of  Water  Resources  Development  and  Management.  All  feasibility studies, EIAs and detailed designs were completed and construction of the dam started in    67

Sélectionner le paragraphe cible3