The  project proponents are the governments of Zambia and Zimbabwe with lead agents being  the  Zambezi River Authority (ZRA) for the dam development and Zimbabwe Electricity Supply Authority  (ZESA) and Zambia Electricity Supply Corporation (ZESCO) for the south and north bank power station  developments  respectively.  Feasibility  studies  were  concluded  in  1993,  financed  by  the  AfDB  and  supplemented  by  site/foundation  exploratory  works  financed  by  the  Zimbabwe  Government.  The  next  project  development  stage  is  final  designs  to  be  conducted  in  2013  and  tendering  for  construction in 2014. Construction of the dam and power stations is expected to start in 2015 and  will be completed by 2021.     The estimated total project costs are US$4 billion. The project can be considered to be in Phase 4 of  the ICA Project Development Phases. Possible project financiers are the AfDB, DBSA and the World  Bank.     The major project challenges include:        Obtaining final approval to proceed with the project from both governments; and  Timely sourcing of project finances.  Songwe River Basin Development Programme (Project RG‐4)  The  overall  goal  of  the  Songwe  River  Basin  Development  Programme  (SRBDP)  is  to  contribute  to  improved living conditions of the basin population and the socio‐economic development in Malawi  and  Tanzania.  The  specific  objective  is  to  prepare  designs  and  joint  investment  projects  for  implementation,  and  to  create  an  effective  enabling  environment  for  trans‐boundary  water  resources management in the Songwe River Basin. The project is structured in five components:    1. Preparation of a shared vision towards 2050 and a 10‐year SRBDP;  2. Detailed design and preparation of priority investments as a major task;  3. Environmental and social safeguarding of the SRBDP by means of a strategic environmental and  social assessment and environmental and social impact assessment for the programme;  4. Establishment of a Songwe River Basin Authority and associated IWRM capacity building at local  level; and  5. Support  to  project  management  and  resource  mobilisation  for  the  implementation  of  capital  investments under the programme.      With  regards  to  water  sector  infrastructure  development  projects,  the  SRBDP  will  construct  the  lower dam with a capacity of 10 x 106 m3, which will irrigate some 200 ha and also generate about  153  MW.  It  is  estimated  that  the  project  will  benefit  some  250  000  people  who  will  also  have  improved water supply and sanitation services.    The  project  proponents  are  the  governments  of  Malawi  and  Tanzania.  Feasibility  studies  were  concluded in 1994, financed by the AfDB. The next project development stage is final designs to be  conducted  from  2012  to  2013  and  tendering  for  construction  in  2014.  Implementation  and  construction of the associated project components is expected to start in 2015 and will be completed  in 2021.     The estimated total project costs are US$328 million. The project can be considered to be in Phase 4  of the ICA Project Development Phases. Possible project financiers are the AfDB, Sida and the World  Bank.       58

Sélectionner le paragraphe cible3