Table 3.1: Water Sector Projects, Prioritised by the Maseru Investment Conference (Source SADC 2011)  1  REGIONAL PROJECTS    RG‐1  Inga III Hydropower   DRC, electric power shared regionally  RG‐2  Lesotho Highlands Phase II  Lesotho, South Africa  RG‐3  Batoka Gorge Hydropower Scheme  Zambia, Zimbabwe  RG‐4  Songwe River Basin Development Project  Malawi, Tanzania  2  CROSS‐BORDER PROJECTS    XB‐1  Upper Okavango Food Security  Angola, Namibia  XB‐2  Vaal‐Gamagara Water Supply  Botswana, South Africa  XB‐3  Ressano Garcia Weir  Mozambique, South Africa  XB‐4  Lomahasha‐Namaacha Water Supply  Swaziland, Mozambique  XB‐5  Water Supply and Sanitation to 12 Locations  Angola, Botswana, DRC, Malawi, Mozambique,  Tanzania, Zambia, Zimbabwe  3  NATIONAL PRIORITY PROJECTS    P1‐1  Water Supply and Sanitation – Lubango Phase 2  Angola  P1‐2  Limpopo Basin Water Monitoring  Botswana  P1‐3  Water Supply and Sanitation – Kinshasa  DRC  P1‐4  Lesotho Lowlands Water Supply Scheme – Zone 1  Lesotho  P1‐5  Mombezi Multi‐purpose Dam  Malawi  P1‐6  Water Supply – 13 Housing Estates  Mauritius  P1‐7  Movene Dam  Mozambique  P1‐8  Artificial Recharge of Windhoek Aquifer – Phases 2B and 3  Namibia  P1‐9  Reducing  Non‐Revenue  Water  and  Increasing  Use  Seychelles  Efficiency  P1‐10  Demand Management in 62 Urban Centres  South Africa  P1‐11  Nodvo Dam  Swaziland  P1‐12  Ruhuhu Valley Irrigation Scheme  Tanzania  P1‐13  Climate  Change  Adaptation  to  drought  –  Agro‐ecological  Zambia  Region I  P1‐14  Bulawayo‐Zambezi Water Supply Scheme  Zimbabwe    It  should  be  noted,  however,  that  the  23  Maseru  prioritised  projects  are  at  varying  stages  of  development.  Some  are  at  conceptual  stage,  while  others  are  at  advanced  stages  of  project  preparation. Some of the projects, such as the Water Supply and Sanitation at 12 Locations Project  (Project XB‐5), need further detailed investigation, especially to assess their cross‐border nature. At  the time of compiling the report for the Investor Conference in Maseru, consultations on the cross‐ border  projects  have  not  been  completed  with  all  the  potential  participating  countries,  and  more  follow‐up action is required  to  bring all potential  participating  countries together for  consensus on  the projects. However, the majority of the 23 projects were selected on the basis of their readiness  for implementation, rather than for their contribution towards the Vision 2027 Water Sector targets.  The Water Sector RIDMP projects are fully described in the Annexure.      34

Sélectionner le paragraphe cible3