Monitoring and Reporting
47.
Overall comprehensive results-based RISDP/SIPO Monitoring and
Reporting System has to be developed at both strategic and
operational level with the participation of all stakeholders.
48.
At the operational and technical level the SADC Secretariat and the
SADC National Committees will be responsible for RISDP monitoring
on a regular basis.
49.
In consultation with all stakeholders, SADC Secretariat will produce an
annual report on the overall implementation of the RISDP. Annual
progress reports on the implementation of the RISDP and SIPO will be
tabled at the Integrated Committee of Ministers and the Ministerial
Committee of the Organ, respectively.
50.
ICP Monitoring and Reporting Systems would be aligned with the
overall RISDP Monitoring and reporting system.
12