INFRASTRUCTURE SUPPORT FOR REGIONAL INTEGRATION AND POVERTY ERADICATION
Member States,
SADC, ASANRA
DR Congo, SADC
Angola, DR Congo,
SADC
Increased levels of
ppp funded projects
Overload trucks
reduced to 10%
Road management
systems established in
Member States, and
reports to regional
association of road
agencies
Network identified and
condition survey reports
Feasibility study reports,
business plans
By 2004
By 2004
By 2004
By 2004
By 2004
Promote public-private
partnerships
Develop administrative
overload control
measures
Develop computer-based
inventory and management systems to assist
with identification of
backlog maintenance
requirements and maintenance programmes
Complete identification
of Regional Trunk Road
network in DR Congo
Feasibility studies for
sections of regional road
and railway networks
Promote effective road
management systems
To rehabilitate
infrastructure
Promote investment in
war damaged transport
infrastructure in Angola
and DR Congo
Member States,
regional operators
association, road
transport industry
Member States,
private sector
Member States,
SADC, private
sector
Reduced levels of
backlog maintenance
By 2004
Develop harmonised
user-pay systems for
transport infrastructure
Develop systems for
sustainable funding of
transport infrastructure
To maintain transport
infrastructure
RESPONSIBILITY
INDICATORS
TIME FRAMES
STRATEGIES
OBJECTIVES
MEASURES
c) TRANSPORT
PRIORITY INTERVENTION AREA: Infrastructure Support for Regional Integration and Poverty Eradication GOAL: To ensure the availability of a sufficient, integrated,
efficient and cost effective infrastructure system that will support and sustain regional economic development, trade and investment for poverty alleviation
TABLE 4.11
REGIONAL
INDIC ATIVE STRATEGIC DEVELOPMENT PL AN
1 2 3
Sélectionner le paragraphe cible3
Se connecter à un paragraphe
Connect to an entity
Disable highlights
Ajouter à la table des matières