8 4
S O U T H E R N
A F R I C A N
D E V E L O P M E N T
C O M M U N I T Y
6.2.1
ownership of outputs by beneficiaries and facilitate
Only programmes that add value to regional integration,
integration with other initiatives at the national, regional,
or enhance the capacity to achieve SADC objectives will
continental and global levels.
be implemented as priorities. This principle of
additionality is essential in the sense that Member States
6.2.6
will respect the RISDP only to the extent that it is seen to
In order to realise maximum impact and to address the
be adding value or generating solutions to common
development discrepancies that exist between Member
problems faced by the Region.
States, it is essential that the RISDP is implemented, as
far as possible, in the context of spatial development
6.2.2
initiatives such as development corridors, growth
Implementation of the RISDP must be based on broad
triangles, growth centres and transfrontier conservation
participation and consultation, in order to engage as
areas. Special consideration should also be given to
many stakeholders as possible, to create ownership for
the outputs, and to internalise the principles upon which
it is based.
allowing for variable geometry, where a group of Member
States could move faster on certain activities and the
experiences learnt replicated in other Member States. The
bottom line in prioritising programmes should be their
6.2.3
potential contribution towards poverty eradication.
Management of programmes in the context of the RISDP
should adopt the principle of subsidiarity, whereby all
programmes and activities are undertaken at levels where
they can be best handled. This means that the
involvement of institutions, authorities, and agencies
outside SADC structures to initiate and implement
regional programmes using their own generated
6.2.7
While the RISDP provides a broad framework; detailed
implementation plans should be drawn up for each
intervention area/programme, clearly spelling out issues
such as who the different actors are, implementation and
management roles, benchmarks, and sustainability.
resources should be promoted and encouraged. This will
ensure that the available capacity of the Secretariat is
most efficiently utilised for policy development and
harmonisation, as well as programme coordination and
management.
6.2.4
Related to the above is the maximum engagement of
regional expertise and institutions for programme
management and implementation, which should further
6.3
CHALLENGES TO RISDP IMPLEMENTATION
6.3.1
Resources required for the implementation of
the RISDP
Significant human and financial resources will be required
for the implementation of the RISDP programmes.
Securing adequate resources poses a key challenge upon
enhance capacity building and local ownership. This
which the effective implementation and rollout of the
paves the way for the appointment of Implementing
RISDP depends.
Agents, i.e. institutions (or management bodies) at
regional or national level (depending upon the scope of
the programme) that are given responsibility for
6.3.2
Institutional Coordination
overseeing and managing the implementation of
The role of the Secretariat in the implementation of the
individual programmes.
RISDP will be that of facilitation and coordination.
Implementation on the ground will be the responsibility of
6.2.5
stakeholders. Managing the various interests and
The decentralised management approach will ensure
perspectives of all stakeholders poses a major challenge
adoption of the participatory approach, promote
that may require capacity strengthening at the Secretariat.
Sélectionner le paragraphe cible3
Se connecter à un paragraphe
Connect to an entity
Disable highlights
Ajouter à la table des matières