run  by  minimising  losses  and  wastage  and  by  so  doing,  delaying  the  need  to  construct  additional  infrastructure, usually at higher capital cost. In any event,��why build new infrastructure when similar  old infrastructure cannot be efficiently managed?    This project will assess the level of NRW, water losses and water re‐use in all the 15 capital cities of  the SADC Member States, and recommend appropriate actions to be taken for each city. The water  eventually  saved  from  the  applied  measures  would  be  used  to  supply  new  consumers.  Revenue  streams  would  improve,  as  the  water  supply  systems  would  also  be  more  efficient.  It  is  estimated  that it will cost US$1 million per city for the study, giving a total cost for all 15 cities of US$15 million.  The  project  would  start  with  the  drafting  of  the  ToR  for  the  project  in  2013,  tendering  for  the  consultancy work in 2013 and execution of the project in 2014. Project profiles for each city would be  produced for the mitigatory works and associated costs.    Possible project financiers are DBSA, GEF and the AfDB. The project can be considered to be in Phase  4 of the ICA Project Development Phases.    The major project challenge foreseen is timely sourcing of project finances.    Studies    There  are  six  SADC  studies  which  have  been  included  in  the  Water  Sector  RIDMP:  Limpopo  Basin  Water  Monitoring,  Assessment  of  the  Groundwater  Resources  Potential  of  the  SADC  Region,  Monitoring  Climate  Change  Adaptation  to  Drought,  Monitoring  Water  Pollution  in  Reservoirs  and  Rivers, Piloting Synchronised and Conjunctive Operation of Dams and Implications of Virtual Water  Trading in Water Resources Development and Usage in the SADC Region.    Limpopo River Basin Water Monitoring Project (Project P1‐2)  The  Upper  and  Middle  Limpopo  River  Basin  has  witnessed  increased  development  with  numerous  large‐scale irrigation developments having been implemented in the basin in recent years. This has  occurred with little or no coordination among stakeholders in Botswana, Mozambique, South Africa  and  Zimbabwe  in  the  planning  and  implementation  of  these  projects,  resulting  in  uncoordinated  drawdowns on the water resources in the basin. The four countries have also never jointly addressed  the concomitant environmental impacts characterised by increasing levels of water pollution.     While this proposed project is not an infrastructure development project per se, it is an initiative that  will  inform  the  extent  to  which  the  development  and  utilisation  of  water  resources  linked  infrastructure  will  have  on  the  basin.  The  data  collected  on  water  resources  management  and  pollution will also be of great importance in the debates on equitable water allocation across all user  sectors in the basin. The stakeholders in the basin consider this to be an important initiative, given  the paucity of water resources in the basin. Critical aspects to be monitored and reported on include  water pollution, soil loss and sustainable development. Data sharing across all four countries will be  imperative if sustainable water resources management is to be achieved in the Limpopo River Basin.    The  project  proponent  is  the  Government  of  Botswana,  which  has  to  collaborate  with  the  other  project  riparian  states  of  South  Africa,  Zimbabwe  and  Mozambique.  Feasibility  studies  should  be  completed in 2013. Detailed designs and tendering for construction of monitoring works will be done  in 2014. Procurement of equipment and instruments and the construction of the monitoring stations  would start in��2015 and be completed by 2016. The estimated total project costs are US$1 million.  The project can be considered to be in Phase 3 of the ICA Project Development Phases.    Possible project financiers are Sida.    52

اختر الفقرة المستهدفة3