The  major  project  challenges  are  the  timely  sourcing  of  project  finances,  as  well  as  achieving  consensus on the project with the project riparian states.     Assessment of the Groundwater Resources Potential of the SADC Region (Project GP‐5)  The project proponent is the SADC Groundwater and Drought Management Project, with the SADC  Member States Water Sector Ministries as the lead agencies. Groundwater is of critical importance  in the SADC region, as it is the main source of water for at least 70% of the population.  However,  very little is known in the SADC region regarding underground water in general, and its interaction  with  surface  water  in  particular.  Groundwater  usually  provides  a  secure  and  cost‐effective  water  supply solution, requiring little or no treatment in arid regions where surface water is seasonal, in  rural  areas  with  dispersed  populations,  for  stock  watering  and  for  small  town  water  supplies.  Groundwater  provides  a  cushion  against  droughts,  and  many  boreholes  and  protected  wells  have  been drilled and sunk during droughts.     A pilot SADC regional project with the following objectives should be formulated and implemented  which will inform the SADC region:     Create  awareness  of  the  importance  of  and  the  critical  role  that  groundwater  plays  in  providing water to at least 70% of the SADC region’s population;   Assess  the  groundwater  capacity,  abstraction  rates  and  recharge  capabilities  of  aquifer  systems  of  the  SADC  region,  bearing  in  mind  that  most  of  these  aquifer  systems  are  fossil  waters and not renewable;   Produce a comprehensive SADC regional hydro‐geological map;   Ensure,  through  the  project,  that  provisions  on  groundwater  management  are  included  in  shared watercourse agreements, particularly for trans‐boundary aquifers;   Improve groundwater modelling; and   Improve  the  understanding  of  the  protection  and  recharge  mechanisms  of  groundwater  resources.     The  knowledge  gained  from  this  project  will  assist  in  the  planning  and  development  of  water  resources and related infrastructure developments. It is estimated that the total cost of the project  would be US$15 million spent over eight years. The project would start with the drafting of the ToR  for the project in 2013, tendering for the consultancy work in 2013 and commencement of execution  of the project in 2014, ending in 2020.     Possible project financiers are UNEP, GEF and the AfDB. The project can be considered to be in Phase  2 of the ICA Project Development Phases.    The major project challenge foreseen is timely sourcing of project finances.    Monitoring Climate Change Adaptation to Drought ‐ Agro‐ecological Region I, Zambia (Project GP‐ 6)  The overall objective of the Climate Change Adaptation to Drought Project (P1‐13) is to reduce the  vulnerability of those depending on rain‐fed agricultural practices to anticipate rainfall shortages in  the  face  of  climate  change/variability.  Agro‐ecological  Region  (AER)  I  covers  the  western  and  southern parts of Zambia, and receives less than 800 mm of rain annually. Project P1‐13 will focus on  the introduction of irrigation and water management systems, training, capacity building of farmers  on  water  management  practices,  support  to  marketing  and  provision  of  finance  credit  facilities.  It  will also support the introduction of drought resistant crops such as cassava, beans, sorghum, millet,    53

اختر الفقرة المستهدفة3