The major project challenges are the timely sourcing of project finances, achieving consensus on the  selection of the 62 urban centres that will benefit and the capability/capacity of some of the selected  urban  centres  to  successfully  implement  their  component  of  the  project.  There  will  be  a  need  for  enhancing capacity in such urban centres.    Capacity  Enhancement  in  Infrastructure  Project  Preparation,  Resource  Mobilisation  and  Piloting  (Project GP‐4)  Under  the  RSAP  III  Programmes,  Programmes  7,  8  and  9  (Infrastructure  Project  Preparation,  Resource  Mobilisation  for  Infrastructure  Development  and  Infrastructure  Piloting  respectively)  should be given urgent priority and rolled out to all the SADC regional/RBO/national institutions that  are  going  to  implement  the  new  Water  Sector  infrastructure.  The  objectives  of  this  capacity  enhancement project is to enable the SADC national/bi‐national/RBOs to be fully capacitated so as  to  be  able  to  develop,  prepare  and  package  bankable  water  infrastructure  projects  that  can  be  submitted to international financial institutions.     Prior  to  implementation  of  the  proposed  capacity  enhancement  in  infrastructure  project  preparation, resource mobilisation and piloting project, the following should be undertaken through  the SADC Water Division:     Existing  training  manuals  are  promoted  and  new  manuals  are  developed  to  assist  policy‐ makers, decision‐makers and professionals with issues around the sustainable development of  large water infrastructure; and   A  training  manual  is  developed  that  documents  the  different  stages  and  requirements  of  project preparation; from the description of the enabling environment, to project definition,  project feasibility, resource mobilisation and post‐implementation support.    There will thus be two phases to this project: preparation of training manuals and the training itself.  It is estimated that the cost of preparing the training manuals would be US$0.25 million and the cost  of  the  training  would  be  US$0.75  million,  giving  a  total  cost  for  the  project  of  US$1  million.  The  project  would  start  with  the  preparation  of  the  training  manuals  in  early  2013  and  end  with  the  conclusion of training in 2014.     Possible project financiers are GIZ and DBSA. The project can be considered to be in Phase 3 of the  ICA Project Development Phases.    The major project challenge foreseen is timely sourcing of project finances.    Reduction in Non‐revenue Water and Water Losses in the Capital Cities of the SADC Member States  (Project GP‐8)  The  project  proponents  are  the  SADC  Member  States  with  the  water  utilities  for  each  capital  city  being  the  implementing  agency.  This  is  an  investment  opportunity  study.  The  objectives  of  this  proposed  project  are  similar  to  those  of  Projects  P1‐9  and  P1‐10,  which  are  to  reduce  the  water  demand of water users by reducing water losses and NRW, achieve greater water use efficiency and  use  of  appropriate  metering,  monitoring  and  data  analysis  methods  to  document  volumes  delivered/provided  and  used.  The  resultant  water  savings  can  then  be  used  to  supply  new  consumers. The management of the water situation in all the 15 capital cities of the SADC Member  States can be improved by applying WDM principles. Activities such as pipe leakage repair, pressure  reduction, re‐use of water and metering with commensurate data analysis can be introduced, with  good results and resultant benefits to the consumers being serviced. Water conservation and water  demand management measures provide cost‐effective means of reducing water demands in the long    51

اختر الفقرة المستهدفة3