infrastructure development and rehabilitation within the project area. The project will cover only the  most  urgent  agriculture‐related  needs,  but  can  also  identify  and  prepare  proposals  for  further  infrastructure  investment,  particularly  for  roads  and  bridges.  The  last  component  of  the  project  entails regional coordination and management. A project implementation unit will be established in  each  country  with  the  Ministry  of  Agriculture  in  each  country  leading  such  implementation.  A  Coordination  Committee  will  be  hosted  by  OKACOM  with  representatives  from  the  AfDB,  FAO,  Angola, Namibia and Botswana.    Initially,  this is more of a capacity  enhancement project, with  minimal water sector developmental  infrastructure, which would be developed later. The project, however, fits in well within the RSAP III  Pillars,  as  it  aims  to  improve  water  management  within  the  project  area  with  overall  goals  of  improving livelihoods and��poverty eradication.    The  project  proponents  are  the  Ministry  of  Agriculture  in  Angola  and  the  Ministry  of  Agriculture,  Water and  Forestry in Namibia. The next project development stage is a pre‐feasibility study to be  completed  in  2012.  Thereafter,  feasibility  studies  will  be  carried  out  from  2013  to  2014.  Implementation and construction of the associated project components is expected to start in 2015  and will be completed in 2019. The estimated total project costs are US$66 million. US$1.5 million is  required  to  undertake  the  feasibility  studies  and  will  likely  be  financed  by  the  AfDB  and  FAO.  The  project can be considered to be in Phase 2 of the ICA Project Development Phases.    No major challenges in the implementation of the project are foreseen at this stage. OKACOM can be  capacitated to spearhead and implement this project.    Water Demand Management in 62 urban centres (Project P1‐10)  The  objectives  of  this  project  are  to  reduce  the  water  demand  of  water  users  by  reducing  water  losses  and  non‐revenue  water  (NRW),  achieve  greater  water  use  efficiency,  increased  water  re‐use  and  use  of  appropriate  metering,  monitoring  and  data  analysis  methods  to  document  volumes  delivered/provided and used. The resultant water savings can be used to supply new consumers. The  management  of  the  water  situation  in  South  Africa  can  be  improved  by  applying  water  demand  management  (WDM)  principles  in  major  metros  and  municipalities.  Activities  such  as  pipe  leakage  repair,  pressure  reduction,  re‐use  of  water  and  metering  with  commensurate  data  analysis  can  be  introduced with good results, and resultant benefits to the communities being serviced. Numerous  studies have shown that water conservation and water demand management measures provide cost‐ effective means of reducing water demands in the long run, by minimising losses and wastage and by  so doing, delaying the need to construct additional infrastructure, usually at higher capital cost.    Assuming  on  average  that  30  000  people  per  urban  centre  will  be  served  from  the  water  saved  through demand management and reduction of water losses, a total of 1 860 000 people will benefit  from this project.     The  project  proponent  is  the  Department  of  Water  Affairs.  Pre‐feasibility  studies  need  to  be  completed by 2013 for the 62 urban centres yet to be identified. Feasibility studies would then follow  in  2014.  Detailed  designs  and  tendering  for  project  implementation  will  be  done  in  2015.  Implementation and construction of the associated project components is expected to start in 2016  and will be completed by 2020. Assuming a cost of US$1 million per urban centre for the studies and  implementation costs, the estimated total project costs for the 62 urban centres are US$62 million.  The project can be considered to be in Phase 1 of the ICA Project Development Phases.    Possible project financiers are DBSA and the African Water Facility.      50

اختر الفقرة المستهدفة3