Project title   Lesotho Highlands Phase II (Project RG‐2)  Project sponsors  The project proponents are the Lesotho Highlands Development Authority (LHDA) and  the Lesotho Highlands Water Commission (LHWC)  Participating countries  Lesotho and South Africa  Objectives  To construct the Polihali Multi‐purpose Dam to transfer water to the Katse Dam and  then  through  the  existing  infrastructure  and  the  Muela  Hydropower  Complex  to  augment  water  supply  to  the  Gauteng  and  the  Vaal  River  water  supply  system.  The  project  will  also  provide  advanced  infrastructure,  environmental  and  social  development programmes in Lesotho.  Project description  The total project was originally conceived to transfer 70 m3/s from the upper portions  of  the  Lesotho  Highlands  into  the  Vaal  River  Basin.  The  aim  of  Phase  II  is  to  deliver  more water by gravity to the Vaal River system in South Africa. Phase II is expected to  increase surface water storage in Lesotho by 2.2 x 106 m3 and the existing hydropower  generation capacity in Lesotho by 1 200 MW, to the benefit of both local and regional  power consumption.     From  the  social  and  environmental  perspective,  it  is  estimated  that  about  17 000  people from 72 villages will be affected and compensated accordingly, and will further  benefit from improved water supply and sanitation services.   Expected results  Increased  surface  water  storage  in  Lesotho  by  2.2    x  106  m3,  generate  an  additional  1 200  MW  and  provide  adequate  safe  drinking  water  and  sanitation  services  to  the  17 000 people displaced by the project.   Ongoing  related  activities  in  the  The  DBSA  has  provided  about  R1 billion  to  the  earlier  aspects  of  the  project  since  it  region   started in the late 1980s.  Description of national plan to the  The LHWP project has been implemented in a number of phases and Phase 1A and 1B,  project  which  included  building  the  Katse  and  Mohale  dams  and  their  tunnel  systems,  have  been  completed.  The  agreement  to  proceed  with  implementation  of  Phase  2  was  announced  by  Lesotho  and  South  Africa  in  December  2008,  and  finally  signed  in  August 2011.  Status  The  project  can  be  considered  to  be  in  Phase  3  of  the  ICA  Project  Development  Phases.  Next steps  Pre‐feasibility studies were concluded in 2011, financed by the DBSA. The next project  development  stage  is  feasibility  studies  to  be  conducted  in  2012,  followed  by  final  designs in 2013 and tendering for construction in 2014. Construction of the project is  expected to start in 2015 and will be completed in 2020.   Business model  Investment project, financed as a BOT or from loans.  Main parties in place  LHDA, LHWC  Main parties to be procured  Possible project financiers are the AfDB and DBSA.   Project challenges  The major project challenges include:     The resettlement and timely compensation of the 3 300 families from the 72  villages;   Conclusion  of  the  royalties  and  water  purchase  agreements  between  Lesotho and South Africa; and   The timely sourcing of project finances.  Project documentation available  1. Water  project  to  create  jobs  for  construction  workers.  Lesotho  Times.  2010.  http://www.lestimes.com/?p=4314. Accessed 18 August 2011.  2. International Water Power And Dam Construction, An African Success Story. June  2010.  http://www.waterpowermagazine.com/story.asp?storyCode=2056820.  Accessed 18 Aug 2011  Intervention requiring financing  Project  to  be  presented  for  financing  during  the  planned  1st  SADC  Infrastructure  Investment Summit and Conference to be held in the last quarter of 2012.  Revenues for financing repayment  This  is  an  infrastructure  investment  project,  which  will  raise  sufficient  revenue  to  repay any loans procured for implementing the project   Estimated total cost  The estimated total project costs are US$1.001 billion.  Execution period  After project funding is secured in 2012 and the final designs and tendering process is  completed in 2014, construction will commence in 2015 and be completed by 2020.       102

اختر الفقرة المستهدفة3