Project title   Inga III Hydropower (Project RG‐1)  Project sponsors  DRC Ministry of Energy.  Participating countries  DRC  Objectives  The  main  objective  is  to  provide  electricity  for  the  people  of  the  DRC  for  improved  wellbeing  and  to  export  electricity  to  increase  the  DRC’s  foreign  revenue  stream.  Besides meeting the internal energy needs of the DRC and the BHP Billiton aluminium  smelter,  excess  power  from  the  Inga  III  Hydropower  project  will  be  exported  to  the  SADC region.  Project description  For  the  Inga  III  Hydropower  project,  no  dam  will  be  constructed.  Water  will  be  diverted  from  the  Congo  River  through  tunnels  to  the  power  station.  The  nominal  power station production capacity will be 4 320 MW (16 x 270 MW units).  Expected results  Production of 4 320 MW for domestic and SADC regional consumption, resulting in an  improved quality of life of the DRC and SADC citizens and economic growth.  Ongoing  related  activities  in  the  The SADC region currently has a power deficit, with most Member States experiencing  region   severe load shedding and power cuts. The SAPP and the power utilities are trying to  fast‐track energy projects to meet this challenge.  Description of national plan to the  AfDB  is  reported  to  have  financed  the  pre‐feasibility  study,  which  has  just  been  project  completed.  Status  The  project  can  be  considered  to  be  in  Phase  4  of  the  ICA  Project  Development  Phases.  Next steps  Pre‐feasibility studies were concluded in 2011 financed by the AfDB. The next project  development  stage  is  feasibility  studies  to  be  conducted  in  2012  followed  by  final  designs in 2013 and tendering for construction in 2014. Construction of the project is  expected to then start in 2015 and will be completed in 2017.   Business model  Investment project financed as a BOT or from loans.  Main parties in place  Ministry of Energy in DRC and SNEL  Main parties to be procured  Possible project financiers are the AfDB, DBSA and the WB.   Project challenges  The major project challenge is timely sourcing of project finances.  Project documentation available  1. INGA hydropower may cost more, 2011 http://www.bloomberg.com/news/2011‐ 06‐30/congo‐s‐inga‐hydropower‐project‐may costmore‐reuters‐reports.html  2. DRC  sees  Inga  3  generating  power  by  2017/18  ,  http://af.reuters.com/article/investingNews/idAFJOE72E0F320110315  3. Talks  with  BHP  Billiton  very  advanced,  2010  http://londonminingnetwork.org/2010/11/congo‐says‐talks‐with‐bhp‐billiton‐ on‐inga‐3‐power‐plant‐are‐very‐advanced/  http://www.bloomberg.com/news/2010‐10‐27/congo‐says‐talks‐with‐bhp‐on‐ building‐inga‐3‐very‐advanced‐.html  4. Run of River Bulk HEG from Congo River without Conventional Dam, 2010 Natural  Resources,  2011,  2,  18‐21  doi:10.4236/nr.2011.21003  Published  Online  March  2011 (http://www.scirp.org/journal/nr)  2011  Intervention requiring financing  Project  to  be  presented  for  financing  during  the  planned  1st  SADC  Infrastructure  Investment Summit and Conference to be held in the last quarter of 2012.  Revenues for financing repayment  This  is  an  infrastructure  investment  project,  which  will  raise  sufficient  revenue  to  repay any loans procured for implementing the project.   Estimated total cost  The estimated total project costs are US$8 billion.   Execution period  After project funding is secured in 2012 and the final designs and tendering process is  completed in 2014, construction will commence in 2015 and be completed by 2017.       101

اختر الفقرة المستهدفة3