Project title   Project sponsors  Participating countries  Objectives  Institutional Reforms for RBOs, River/Water Authorities and Utilities (Project GP‐3)  SADC Water Division  All SADC RBOs, river/water authorities and utilities  This  project's  objective  is  to  study  the  pros  and  cons  of  changing  the  mandates  of  existing RBOs to gear them for joint infrastructure development or for SPVs to be set  up  within  the  River  Basin  for  planning,  developing,  managing  and  operating  joint  infrastructure in the SADC region.   Project description  It  can  be  premised  that  the  intentions  of  the  SADC  Revised  Protocol  on  Shared  Watercourses are for Shared Watercourse Institutions to be sufficiently empowered  to  manage  the  shared  watercourse,  bearing  in  mind  the  definition  of  "managing  a  shared  watercourse",  which  has  provisions  for  infrastructure  development,  operation  and  management  and  for  protecting  the  watercourse's  biodiversity.  Currently,  all  the  RBOs  in  the  SADC  region  are  not  focused  on  infrastructure  development.  Instead,  they  have  an  investigative  and  advisory  mandate  with  the  emphasis being more on determining an overall management system for the basin  that balances socio‐economic development needs with the need for protecting the  basin’s  biodiversity  e.g.  OKACOM,  ORASECOM,  LIMCOM  and  ZAMCOM.  The  SADC  institutions that have a mandate for infrastructure development, management and  operation  were  created  as  Special  Project  Vehicles  (SPVs)  to  execute  particular  projects,  e.g.  KOBWA,  ZRA  and  LHDA.  Against  this  background,  it  is  recommended  that in the river basins where there is a significant development potential, the “core  business”  of  the  RBOs  should  be  oriented  towards  the  preparation,  development,  implementation,  management  and  operation  of  the  SADC's  Water  Sector  RIDMP  projects.   Expected results  The SADC RBOs will have the legal and financial capacity to raise funds independent  of the watercourse states, and will have the mandate for infrastructure development,  management and operation over and above their current investigative and advisory  roles. Where these arrangements cannot be instituted, then SPVs can be created for  infrastructure development, operation and management.  Ongoing  related  activities  in  the  The  SADC  Revised  Protocol  on  Shared  Watercourses  mandates  the  RBOs  and  region   watercourse  institutions  to  manage  the  river  basins  in  their  jurisdiction.  SPVs  have  been created in the past and have successfully implemented, managed and operated  joint infrastructure. Examples are KOBWA, ZRA and LHWC.  Description of national plan to the  Member  States,  in  their  own  right,  where  they  have  joint  projects  can  create  such  project  mandated RBOs or SPVs.  Status  The  project  can  be  considered  to  be  in  Phase  3  of  the  ICA  Project  Development  Phases.  Next steps  The  project  proponent  is  the  SADC  Water  Division,  which  will  appoint  a  suitable  consultant. The ToR and appointment of the consultant can be done in early 2013, in  time  for  recommendations  to  be  submitted  by  mid‐2013  for  decisions  to  be  appropriately made by end of 2013.  Business model  This is a capacity building project.  Main parties in place  SADC Water Division, the SADC RBOs, river/water authorities and utilities.  Main parties to be procured  Possible project financiers are Sida, DANIDA and GIZ.  Project challenges  The major project challenges foreseen are the timely sourcing of project finances and  resistance to change from existing RBOs and their principals.  Project documentation available  The SADC 1st RBO Workshop Report of 2007  Intervention requiring financing  Project to be presented for grant financing during the planned 1st SADC Infrastructure  Investment Summit and Conference to be held in the last quarter of 2012.  Revenues for financing repayment  This is an institutional reform project and grant finances should be sought.   Estimated total cost  The estimated total cost for the project is US$0.1 million.   Execution period  2013  (12  months)  for  the  consultant’s  assessment  and  successful  sourcing  of  grant  funds in 2012. Thereafter, the mandates could be modified or SPVs created.       83

اختر الفقرة المستهدفة3