3. Transport Sector
Project
South African ports: Durban
port expansion
Walvis Bay: port expansion
Benefiting
Member States
Regional
Regional
Huambo Airport:
improvements
Kazungula Bridge: construction Botswana and
of a road bridge which can also Zambia
handle trains in future
Beitbridge – Chirundu: road
upgrading
South Africa and
Zimbabwe
Beitbridge border OSBP:
upgrading and expanding the
infrastructure
Zimbabwe
Trans-Kalahari/Mamuno OSBP
Botswana and
Namibia
National railways of Zimbabwe: Zimbabwe
revival
Ressano Garcia/Lebombo
OSBP: infrastructure upgrades
and redesign of processes
Lobito corridor roads:
rehabilitate the main feeder
roads within the corridor
Dar-es-Salaam: Chalinze toll
road
Mozambique and
South Africa
50
250
932
6
6
200
6
390
Tanzania, Zambia,
DRC and Malawi
SADC Dares-Salaam
corridor
SADC Dares-Salaam
corridor
SADC -Dar
es Salaam
Corridor
585
Makambako – Songea road:
rehabilitation
Tanzania, Zambia,
Malawi
Plumtree – Bulawayo – Gweru
– Harare – Mutare road:
rehabilitation
Zimbabwe,
Mozambique,
Malawi, DRC and
Botswana
Isaka – Keza – Kigali – Msongati Tanzania, Rwanda,
railway line
Burundi and DRC
Executive Summary
SADC TransKalahari
corridor
SADC
Limpopo
corridor
SADC Maputo
corridor
650
SADC Lobito
corridor
Tanzania, Zambia,
DRC and Malawi
30
SADC NorthSouth corridor
SADC TransKalahari
corridor
SADC Lobito
corridor
SADC/
COMESA
North-South
corridor
SADC/
COMESA
Limpopo
corridor
SADC NorthSouth corridor
Project Cost Expected
Estimate
Completion
Project Status
($ million)
Year
2.92 billion 2014 – 2017 Ongoing
Angola
Nakonde – Tunduma OSBP
Tanzania Railway Limited
services: revival
Region
Tanzania, Rwanda,
Burundi and DRC
SADC
Beira and
North-South
corridors
SADC
Tripartite
Central
corridor
SADC
Tripartite
Central
corridor
8
138
206
3,130
362
2014 – 2017 Detailed design completed.
Procurement for works
contract ongoing.
2013 – 2017 Pre-feasibility studies
completed
2012 – 2014 Detailed design completed.
MoU and project
implementation arrangements
being finalised
2013 – 2016 Feasibility studies completed
2013 – 2014 Ongoing consultation
between Zimbabwe and
South Africa. Preliminary
studies ongoing
2013 – 2014 Feasibility studies completed
2013
Feasibility studies ongoing
2013 – 2014 Feasibility studies completed.
Some works completed, but
main pending
2012 – 2016 Feasibility studies and some
works ongoing
2012 – 2017 Feasibility studies completed
in 2010. PPP viability study
completed
2012 – 2017 Feasibility studies completed
and construction started on
Zambian side. MOU signed
2012 – 2017 The road section is under
detailed design through
World Bank financing. Funds
required for rehabilitation
2012 – 2017 Minor works ongoing
2012 – 2017 Feasibility study completed
2012 – 2017 Ongoing