2. Tourism Sector
Project
Upgrading of the Sani Pass road
from Himeville to Mokhotlong
(Maloti/Drakensberg TFCA)
Relocation of Sani Pass border
post (Maloti/Drakensberg
TFCA)
Limpopo River
Crossing(GLTFCA) – Kruger
and Gonarezhou
Upgrading of the Barberton
to Piggs Peak road (Lubombo
TFCA)
Construction of the Dinosaur
Interpretative Centre at Golden
Gate National Park (Maloti –
Drakensberg TFCA)
Upgrading of Joel's Drift
to Monontsa Pass road
and border post (Maloti –
Drakensberg TFCA)
Upgrading of Ha Mpiti to
Sehlabathebe National Park
via Ramatseliso's border gate
(Maloti – Drakensberg TFCA)
Upgrading of Ongeluksnek
Pass and establishing the
one-stop border post (Maloti –
Drakensberg TFCA)
Upgrading of Aliwalskop to
Telebridge Road (Maloti –
Drakensberg TFCA)
Usuthu Gorge (Mambane)
Community Conservation Area
Fencing (Lubombo TFCA)
Construction of access bridge
between Mooiplaas and
Doorhoek Gate, Songimvelo
Nature Reserve (Lubombo
TFCA)
Development of a tourist link
road alongside the Komati
River, linking the Songimvelo
and Malolotja game reserves
(Lubombo TFCA)
Policy harmonisation,
institutional strengthening and
strategy development
Development of marketing
tools and systems, as well as
building capacity to create
awareness for the Uni-Visa
Benefiting
Countries/Owners
Region
Project Cost Expected
Estimate
Completion
Project Status
($ million)
Year
62.50
2012 – 2014 Feasibility study completed
Lesotho, South
Africa
SADC
Lesotho, South
Africa,
SADC
6.20
South Africa,
Zimbabwe
SADC
2.40
Swaziland
SADC
10.00
South Africa
SADC
28.00
2012 – 2014 Business plan, feasibility study
and conceptual exhibition
design completed
Lesotho
SADC
42.00
2012 – 2016 Seeking an investor
Lesotho
SADC
112.50
2012 – 2016 Seeking an investor
Lesotho
SADC
36.00
2012 – 2016 Seeking an investor
Lesotho
SADC
7.20
2012 – 2016 Seeking an investor
Swaziland
SADC
7.00
2012 – 2016 Seeking an investor
South Africa
SADC
3.00
2013 – 2017 Seeking an investor
South Africa,
Swaziland
SADC
1.50
2013 – 2017 Seeking an investor
All SADC Member
States
SADC
1.20
2013 – 2017
Pilot members:
Angola,
Mozambique,
Namibia, Swaziland
and Zimbabwe
Development and marketing of Mauritius and
trans-national tourism products Seychelles
for the Vanilla Islands States
Total
SADC
1.50
2013 – 2017
SADC
3.00
2013 – 2017
2012 – 2014 EIA, structural design
and geotechnical reports
completed
2012 – 2014 EIA completed. Scoping
report in place and site
identified
2012 – 2014 The road is currently an
unpaved 4x4 road
324 million
Executive Summary
29