2. Tourism Sector Project Upgrading of the Sani Pass road from Himeville to Mokhotlong (Maloti/Drakensberg TFCA) Relocation of Sani Pass border post (Maloti/Drakensberg TFCA) Limpopo River Crossing(GLTFCA) – Kruger and Gonarezhou Upgrading of the Barberton to Piggs Peak road (Lubombo TFCA) Construction of the Dinosaur Interpretative Centre at Golden Gate National Park (Maloti – Drakensberg TFCA) Upgrading of Joel's Drift to Monontsa Pass road and border post (Maloti – Drakensberg TFCA) Upgrading of Ha Mpiti to Sehlabathebe National Park via Ramatseliso's border gate (Maloti – Drakensberg TFCA) Upgrading of Ongeluksnek Pass and establishing the one-stop border post (Maloti – Drakensberg TFCA) Upgrading of Aliwalskop to Telebridge Road (Maloti – Drakensberg TFCA) Usuthu Gorge (Mambane) Community Conservation Area Fencing (Lubombo TFCA) Construction of access bridge between Mooiplaas and Doorhoek Gate, Songimvelo Nature Reserve (Lubombo TFCA) Development of a tourist link road alongside the Komati River, linking the Songimvelo and Malolotja game reserves (Lubombo TFCA) Policy harmonisation, institutional strengthening and strategy development Development of marketing tools and systems, as well as building capacity to create awareness for the Uni-Visa Benefiting Countries/Owners Region Project Cost Expected Estimate Completion Project Status ($ million) Year 62.50 2012 – 2014 Feasibility study completed Lesotho, South Africa SADC Lesotho, South Africa, SADC 6.20 South Africa, Zimbabwe SADC 2.40 Swaziland SADC 10.00 South Africa SADC 28.00 2012 – 2014 Business plan, feasibility study and conceptual exhibition design completed Lesotho SADC 42.00 2012 – 2016 Seeking an investor Lesotho SADC 112.50 2012 – 2016 Seeking an investor Lesotho SADC 36.00 2012 – 2016 Seeking an investor Lesotho SADC 7.20 2012 – 2016 Seeking an investor Swaziland SADC 7.00 2012 – 2016 Seeking an investor South Africa SADC 3.00 2013 – 2017 Seeking an investor South Africa, Swaziland SADC 1.50 2013 – 2017 Seeking an investor All SADC Member States SADC 1.20 2013 – 2017 Pilot members: Angola, Mozambique, Namibia, Swaziland and Zimbabwe Development and marketing of Mauritius and trans-national tourism products Seychelles for the Vanilla Islands States Total SADC 1.50 2013 – 2017 SADC 3.00 2013 – 2017 2012 – 2014 EIA, structural design and geotechnical reports completed 2012 – 2014 EIA completed. Scoping report in place and site identified 2012 – 2014 The road is currently an unpaved 4x4 road 324 million Executive Summary 29

اختر الفقرة المستهدفة3