3. Transport Sector Project South African ports: Durban port expansion Walvis Bay: port expansion Benefiting Member States Regional Regional Huambo Airport: improvements Kazungula Bridge: construction Botswana and of a road bridge which can also Zambia handle trains in future Beitbridge – Chirundu: road upgrading South Africa and Zimbabwe Beitbridge border OSBP: upgrading and expanding the infrastructure Zimbabwe Trans-Kalahari/Mamuno OSBP Botswana and Namibia National railways of Zimbabwe: Zimbabwe revival Ressano Garcia/Lebombo OSBP: infrastructure upgrades and redesign of processes Lobito corridor roads: rehabilitate the main feeder roads within the corridor Dar-es-Salaam: Chalinze toll road Mozambique and South Africa 50 250 932 6 6 200 6 390 Tanzania, Zambia, DRC and Malawi SADC Dares-Salaam corridor SADC Dares-Salaam corridor SADC -Dar es Salaam Corridor 585 Makambako – Songea road: rehabilitation Tanzania, Zambia, Malawi Plumtree – Bulawayo – Gweru – Harare – Mutare road: rehabilitation Zimbabwe, Mozambique, Malawi, DRC and Botswana Isaka – Keza – Kigali – Msongati Tanzania, Rwanda, railway line Burundi and DRC Executive Summary SADC TransKalahari corridor SADC Limpopo corridor SADC Maputo corridor 650 SADC Lobito corridor Tanzania, Zambia, DRC and Malawi 30 SADC NorthSouth corridor SADC TransKalahari corridor SADC Lobito corridor SADC/ COMESA North-South corridor SADC/ COMESA Limpopo corridor SADC NorthSouth corridor Project Cost Expected Estimate Completion Project Status ($ million) Year 2.92 billion 2014 – 2017 Ongoing Angola Nakonde – Tunduma OSBP Tanzania Railway Limited services: revival Region Tanzania, Rwanda, Burundi and DRC SADC Beira and North-South corridors SADC Tripartite Central corridor SADC Tripartite Central corridor 8 138 206 3,130 362 2014 – 2017 Detailed design completed. Procurement for works contract ongoing. 2013 – 2017 Pre-feasibility studies completed 2012 – 2014 Detailed design completed. MoU and project implementation arrangements being finalised 2013 – 2016 Feasibility studies completed 2013 – 2014 Ongoing consultation between Zimbabwe and South Africa. Preliminary studies ongoing 2013 – 2014 Feasibility studies completed 2013 Feasibility studies ongoing 2013 – 2014 Feasibility studies completed. Some works completed, but main pending 2012 – 2016 Feasibility studies and some works ongoing 2012 – 2017 Feasibility studies completed in 2010. PPP viability study completed 2012 – 2017 Feasibility studies completed and construction started on Zambian side. MOU signed 2012 – 2017 The road section is under detailed design through World Bank financing. Funds required for rehabilitation 2012 – 2017 Minor works ongoing 2012 – 2017 Feasibility study completed 2012 – 2017 Ongoing

اختر الفقرة المستهدفة3