6.3.5 FUNDING SOURCES
6.3.5.1 NATIONAL GOVERNMENTS
The mobilization of financial resources from SADC national
governments is essential for the implementation of the
RSAP IV. Contributions from SADC Member States can
take different forms:
•
•
•
Financial contributions: SADC’s coordination
function is financed through contributions from
Member States. These contributions are based
on a formula taking into account a number of factors
including Gross Domestic Products (GDP). The
Directorate of Infrastructure and Services, to which
belongs the Water Division, receives eight percent
of the total contributions from Member States on
an annual basis.
Direct Contributions: Member States also contribute
directly to the implementation of specific RSAP
projects.
In-kind contributions: Member States contribute to
the implementation of the RSAP through
RE
AR
D
T
U
W
TO
REGIONAL STRATEGIC ACTION PLAN IV (2016 - 2020)
MUNITY
SOUTHERN
M
CO
AF
T
VE
N DE LOPM
EN
CA
RI
SA
C O M MO N
FU
the provision of equipment, experts, office space,
administrative support and use of facilities for most
RSAP projects. Member States that are members
of a River Basin Organisation (RBO) also carry the
administrative and operational costs (salaries,
overheads, etc.) of these organisations, including
the costs of the commissioners providing guidance
to RBOs.
6.3.5.2 EXTERNAL RESOURCES
The financing of SADC programmes will have to be met
primarily by Member States in the long term. However,
current constraints on the availability of domestic funds
make the use of external financial resources vital in the
short and medium term.
6.4 FUNDING REQUIREMENTS
The total capital requirements for RSAP IV are estimated at
6,500,000 Euros. This includes new projects and ongoing
projects that are a carryover from RSAP III (see Table 6.3
and Annex 1 for more information).
#
Programmes
Costs (000 €)
1
Regional Instruments for Cooperation
4,200
2
RBO/SWI Establishment and Strengthening
15,000
3
Gender, Youth Development and Stakeholder Engagement
3,810
4
Human Capacity Development and Research
21,200
5
Infrastructure Development, Operation and Maintenance
74,700
6
Water Resources Management for Sustainable Growth
14,400
7
Climate Change and Variability
4,900
8
Industrialization and Nexus Approaches
2,790
141,000
TABLE 6.3 RSAP IV: FUNDING REQUIREMENTS
A Vehicle to implement the Water Component of the Regional Indicative Strategic Development Plan (RISDP)
37
اختر الفقرة المستهدفة3
الاتصال بفقرة
Connect to an entity
Disable highlights
أضف إلى جدول المحتويات