projects  of  Phase  1  will  not  meet  the  Vision  2027  water  sector  targets  and  hence  Phase  2  and  3  projects will need to be identified, prepared and packaged for financing and be implemented during  periods 2018 to 2027 and 2023 to 2027 respectively. Other reasons for splitting the implementation  of the water sector part of the SADC RIDMP into three phases are to ensure that:     Appropriate  projects  aligned  to  the  Vision  2027  Water  Sector  targets  are  identified  and  prepared for implementation;   The capacity to prepare, market and implement infrastructure projects in the SADC region is  fully built and enhanced;   Adequate  time  is  provided  for  the  SADC  regional  institutions  and  Member  States  to  gain  confidence and experience in regional infrastructure development; and    Sufficient  time  is  provided  for  the  investors  to  gain  the  confidence  and  trust  to  do  business  with the SADC region.     Table 2: Gap between Current Situation and Vision 2027 targets   SECTOR  CURRENT STATUS  Surface  water  storage  14%  of  ARWR  stored  25%  of  ARWR  stored.  To  meet  SADC  regional  An additional 11% of ARWR to  (includes  Kariba  and  demand. Eventual target is 75% stored as best  be stored  Cahora Bassa dams)  practice is 70‐90% of ARWR stored  Agriculture  3.4  million  hectares  10  million  (20%  potential)  hectares  irrigated.  An  additional  6.6  million  (7%  of  potential)  World average is 20%  hectares to be irrigated  irrigated  Hydropower  12  GW  (8%  potential) installed  VISION 2027 TARGETS  GAP  of  75  GW  (50%  of  potential)  installed  to  meet  An  additional  63  GW  to  be  SAPP targets and exports to other RECs  installed  Water  Supply  61%  of  260  million  75%  of  350  million  people  served.  Eventual  An  additional  14%  of  350  people served  target is 100% served  million people to be served  Sanitation  39%  of  260  million  75%  of  350  million  people  served.  Eventual  An  additional  36%  of  350  people served  target is 100% served  million people to be served  Water  abstraction  44 km3/year abstracted  264  km3/year  abstracted  to  meet  expected  An  increase  to  220  km3/year  increase in water demand  abstracted      Figure 2: Gap between Current Situation and Vision 2027 targets     Of the 34 Phase 1 projects, three are facilitation projects, four are capacity building projects, and six  are studies, while 21 are investment projects. The estimated total cost of all the 34 Phase 1 projects    7

اختر الفقرة المستهدفة3