Project title   Limpopo River Basin Water Monitoring Project (Project P1‐2)  Project sponsors  The project proponent is the Government of Botswana.   Participating countries  South Africa, Zimbabwe and Mozambique and the LIMCOM Secretariat  Objectives  To  promote  sustainable  water  resources  management  and  allocation  in  the  Middle  and  Upper  Limpopo  Basin,  and  to  institute  a  continuous  water  quality  monitoring  programme in the Upper and Middle Limpopo Basin.  Project description  The  Upper  and  Middle  Limpopo  River  Basin  has  witnessed  increased  development  with  numerous  large‐scale  irrigation  developments  having  been  implemented  in  recent  years.  This  has  occurred  with  little  or  no  coordination  among  stakeholders  in  Botswana,  Mozambique,  South  Africa  and  Zimbabwe  in  the  planning  and  implementation of these projects, resulting in uncoordinated drawdowns on the water  resources  in  the  basin.  The  four  countries  have  also  never  jointly  addressed  the  concomitant  environmental  impacts  characterised  by  increasing  levels  of  water  pollution. The waters of the Limpopo River have been exploited for irrigated farming  in  the  Limpopo  Province  of  South  Africa  for  many  years,  with  limited  similar  development  on  the  Botswana  side.  If  pollution  levels  are  allowed  to  increase  unabatedly, there will be serious social and economic impacts on the residents of the  basin.  Increased  pollution  will  result  in  reduced  availability  of  potable  water  and  general  despoilment  of  the  upper  and  middle  sections  of  the  river.  Uncontrolled  pollution will also compromise the development promise brought about by the river  which, if realised, would contribute to poverty eradication, the attainment of the two  countries’ development objectives and the MDGs.  Expected results  While this proposed project is not an infrastructure development project per se, it is  an  initiative  that  will  inform  the  extent  to  which  the  development  and  utilisation  of  water  resources  linked  infrastructure  will  have  on  the  basin.  The  data  collected  on  water  resources  management  and  pollution  will  also  be  of  great  importance  in  the  debates  on  equitable  water  allocation  across  all  user  sectors  in  the  basin.  The  stakeholders in the basin consider this to be an important initiative given the paucity  of water resources. Critical aspects to be monitored and reported upon include: water  pollution, soil loss and sustainable development. Data sharing across all four countries  will be imperative if sustainable water resources management is to be achieved in the  Limpopo  River  Basin.  In  addition  to  data  sharing  and  water  quality  monitoring,  the  four countries have also agreed to develop and implement a stakeholder engagement  strategy to facilitate the sharing of best practices across the whole basin.  Ongoing  related  activities  in  the  Botswana  and  South  Africa  tabled  this  matter  at  the  recent  Limpopo  River  Basin  region   Commission  (LIMCOM)  meeting  in  Maputo,  resulting  in  the  mobilisation  of  both  Mozambique and Zimbabwe to participate in the programme. Under the auspices of  LIMCOM, a programme aimed at harmonising water quality standards and monitoring  processes will be instituted, as will the development of a data sharing protocol among  all four riparian states.  Description of national plan to the  Initial meetings have been held between officials from the two countries with another  project  meeting and site visit scheduled for early July 2011. The monitoring initiative still has  to be scoped out. The project has been discussed at the LIMCOM meetings. While it is  initiated by Botswana and South Africa, the project will have implications for the state  of the river in the downstream and riparian countries of Zimbabwe and Mozambique.  Status  The  project  can  be  considered  to  be  in  Phase  3  of  the  ICA  Project  Development  Phases.  Next steps  Feasibility  studies  should  be  completed  in  2013.  Detailed  designs  and  tendering  for  construction  of  monitoring  works  will  then  be  done  in  2014.  Procurement  of  equipment  and  instruments  and  the  construction  of  the  monitoring  stations  would  then start in 2015 and be completed by 2016.  Business model  This  is  a  study  with  infrastructure  requirements  being  the  construction  of  water  quality monitoring stations.  Main parties in place  The  departments  with  the  water  quality  responsibility  in  each  of  the  four  riparian  states as well as the LIMCON Secretariat.    91

اختر الفقرة المستهدفة3