270 MW units).    The project proponent is the DRC Ministry of Energy. Pre‐feasibility studies were concluded in 2011  financed  by  the  AfDB.  The  next  project  development  stage  is  feasibility  studies  to  be  conducted  in  2012, followed by final designs in 2013 and tendering for construction in 2014. Construction of the  project is expected to start in 2015 and will be completed in 2017.    The estimated total project costs are US$8 billion. The project can be considered to be in Phase 4 of  the ICA Project Development Phases.Possible project financiers are the AfDB, DBSA and the WB.     The major project challenge is timely sourcing of project finances.    Lesotho Highlands Phase II (Project RG‐2)  The total project was originally conceived to transfer 70 m3/s from the upper portions of the Lesotho  Highlands into the Vaal River Basin. The aim of Phase II is to deliver more water by gravity to the Vaal  River system in South Africa. Phase II is expected to increase surface water storage in Lesotho by 2.2 x  106  m3, the existing hydropower generation capacity in Lesotho by 1 200 MW to the benefit of both  local and regional power consumption.     From  the  social  and  environmental  perspective,  it  is  estimated  that  about  17  000  people  from  72  villages will be affected and compensated accordingly, and will further benefit from improved water  supply and sanitation services.     The project proponents are the Lesotho Highlands Development Authority (LHDA) and the Lesotho  Highlands Water Commission (LHWC). Pre‐feasibility studies were concluded in 2011, financed by the  DBSA. The next project development stage is feasibility studies to be conducted in 2012, followed by  final designs in 2013 and tendering for construction in 2014. Construction of the project is expected  to start in 2015 and will be completed in 2020.     The estimated total project costs are US$1.001 billion. The project can be considered to be in Phase 3  of the ICA Project Development Phases. Possible project financiers are the AfDB and DBSA.     The major project challenges include:       The resettlement and timely compensation of the 3 300 families from the 72 villages;  Conclusion  of  the  royalties  and  water  purchase  agreements  between  Lesotho  and  South  Africa; and  The timely sourcing of project finances.    Batoka Hydro‐electric Scheme (Project RG‐3)  The objective of the Batoka Hydro‐electric Scheme is to  increase  the power generation capacity of  Zambia  and  Zimbabwe  and  reduce  reliance  on  coal‐fired  power  stations,  which  are  expensive  to  operate  and  maintain  and  are  associated  with  greenhouse  gas  emissions.  The  project  has  the  potential  to  make  both  Zambia  and  Zimbabwe  power  exporters  after  meeting  local  needs.  The  Batoka Hydro‐electric Scheme involves the construction of a 1 680 x 106  m3 capacity dam, with two  underground  power  stations  producing  a  total  of  1  600  MW.  Two  townships  will  be  established  at  Batoka,  one  in  Zambia  and  the  other  in  Zimbabwe,  with  a  combined  total  population  of  about  200 000 people who will have adequate water supply and sanitation services.         57

اختر الفقرة المستهدفة3