countries and the implementation of such projects;   In  order  to  minimise  the  risk  of  low  stakeholder  response  to  the  project,  considerable  attention  has  to  be  paid  to  the  environmental  and  social  issues  including mitigation, resettlement, compensation schemes, land tenure security,  gender equality and stakeholder involvement throughout the project's lifecycle.  The  project’s  focus  on  economic  development  and  poverty  eradication  should  also encourage positive stakeholder response; and   Changed  hydrological  conditions  due  to  climate  change  and  variability  is  a  potential  threat  to  the  economic  viability  of  the  investments.  The  project  includes  an  analysis  of  hydrological  sensitivity  to  clarify  the  risks  and  advise  on  possible  mitigation  measures  to  be  taken  by  the  Songwe  River  Basin  Authority  once established.   Project documentation available  Songwe  River  Basin  Development  Programme  Detailed  Design  and  Investment  Preparation Project, Appraisal Report. October 2009. Funded by AfDB.  Intervention requiring financing  Project to be presented for grant financing during the planned 1st SADC Infrastructure  Investment Summit and Conference to be held in the last quarter of 2012.  Revenues for financing repayment  This is an infrastructure investment project, which may not raise sufficient revenue to  repay  any  loans  procured  for  implementing  the  project  as  the  project  can  be  considered as a social project.  Estimated total cost  The estimated total project costs are US$328 million.  Execution period  After project funding is secured in 2012 and the final designs and tendering process is  completed in 2014, construction will commence in 2015 and be completed by 2021.       105

اختر الفقرة المستهدفة3