120 days, interest of between 0.5% and 10% per day will be
applied to the contract sum.
10.
That the Defendants have failed and refused to pay the sum
owed the Plaintiff after the expiration of the 120 days.
11.
By a letter dated 14th April, 2015 the Plaintiff gave notice to the
Defendants of its intention to apply the interest rate on the
contract sum as stipulated in the contractual document.
12.
That the failure of the Defendants to pay the Plaintiff resulted
in the withdrawal of the Plaintiff’s operational licence by Outback
power, a solar electricity company from the United States of
America.
13.
That the failure of the Defendants to pay the sum owed have
resulted in untold hardship to the Plaintiff.
14.
By a letter dated 24/04/2015, the Defendants agreed to pay
the sum of
fifty six million, four hundred and fifteen thousand,
four hundred and twenty two naira only (N56, 415,422.00) owed
in the two tranches of the contract.
15.
That the Defendants have paid the sum of Thirty five million,
seven hundred and sixteen thousand, four hundred and twenty
two naira only (N35, 716, 422.00) representing the sum of the first
tranche of contract, leaving the balance of twenty million, six
hundred and ninety eight thousand, nine hundred and twenty
7