MUNITY
SOUTHERN
M
CO
AF
T
VE
N DE LOPM
EN
CA
RI
RE
REGIONAL STRATEGIC ACTION PLAN IV (2016 - 2020)
T
U
W
TO
AR
D
SA
C O M MO N
FU
PROGRAMME 1: REGIONAL INSTRUMENTS FOR COOPERATION
OBJECTIVE: Strengthen the enabling environment for
the coordinated management and development of water
resources in the region
PRIORITY INTERVENTIONS
P1.1 MONITORING AND REPORTING ON THE
IMPLEMENTATION OF RSAP IV, PROTOCOL, AND SDGS
There is need to undertake monitoring and reporting on
the evidence of the contributions of the overall objective
of the RSAP IV, priority interventions on programme
objectives, and the objectives of both the regional water
strategy and policy, the SADC Revised RISDP and Treaty
Goals. This will be done through specific, measurable and
feasible indicators on output and outcome levels. The
activities include:
a) RSAP IV
i. undertaking annual assessments and midterm
reviews of the status of achievement of objectiveindicators of the eight RSAP IV programmes;
ii. capture and reporting on the contributions of
Member States and other entities to the objectives
of the RSAP IV;
b) Protocol
i. defining measurable indicators for assessing
Protocol implementation.
ii. undertaking annual assessments of the status of
implementation of the protocol using defined
indicators, and reporting to SADC Council through
SADC Water Sector Committee of Ministers as per
article 5(2)(c)(viii);
iii. RBOs/SWIs providing progress reports on the
implementation of the Protocol and/or through their
respective Watercourse Agreements to SADC
Secretariat as per Article 5 (3)(c) of the Protocol; and
c) SDGs
i. Regularly collecting information and data from
Member States (MS) indicating the status of
achievement of the water-relevant Sustainable
Development Goals and compliance to UN and AU
initiatives (e.g. conventions).
13
P1.2 POLICY HARMONISATION IN MEMBER STATES
There is need to harmonise national water policies among
Member States, using the SADC RWP as a benchmark. A
survey was conducted during the course of RSAP III which
indicated good progress in domesticating the regional
water policy, though implementation was generally lagging
behind in a number of Member States.
Activities include:
a) mobilising resources for a drawdown facility to assist
Member States that need to harmonise their policy and/or
regulatory instruments. This will be needs driven;
b) conducting a study in each shared watercourse on the
national policies on Member States and how they relate to
Riparian States and SADC policies; and
c) establishing a mechanism or platform for information
and best practices sharing.
P1.3 DEVELOPMENT OF GUIDELINES TO ENHANCE
COOPERATION
Guidelines will be developed in various areas, in a
consultative manner, to enhance cooperation and
harmonisation of approaches following the IWRM
approach. Listed below are the guidelines to be developed
within the given time frame:
a) guidelines on Protocol Implementation (refer to
Programme P2.5(a))
b) guidelines for water infrastructure Project preparation
(refer to Programme P5.1.1 (a));
c) regional guidelines for the implementation of crossborder water infrastructure
(refer to Programme P5.1.2 (d));
d) guidelines for water infrastructure (e.g. dams, water
and waste water treatment plants, water conveyance
systems, etc.), operation and maintenance (refer to
Programme P5.1.4 (b));
e) guidelines for sustainable utilisation of surface and
ground water infrastructure and regulation of reservoir
activities (refer to Programme P5.1.4 (c));
A Vehicle to implement the Water Component of the Regional Indicative Strategic Development Plan (RISDP)