Project title   Lesotho Lowlands Water Supply Scheme – Zone 1 (Project P1‐4)  Project sponsors  The project proponent is the Lesotho Highlands Water Commission.   Participating countries  Lesotho  Objectives  To provide water supply services for Botha‐Bothe and adjacent villages in the north of  Lesotho.   Project description  The  project  will  supply  Botha  Bothe  and  adjacent  villages  with  domestic  water.  The  project is designed in such a way that treated water will be delivered to bulk storage  reservoirs  from  where  the  settlements  will  be  supplied.  The  strategic  storage  will  provide  reliability  during  system  repairs  and  power  outages.  Future  expansions  are  provided  for  in  the  design  of  the  project.  Where  possible,  the  expansion  will  be  through modular design, e.g. twining storage, modular treatment works and pumping  stations. In essence, the facilities can be easily upgraded by adding more components.  The  existing  infrastructure  will  be  integrated,  where  appropriate  or  possible,  but  where the systems are very small or old/unreliable, these will be superseded by the  project  infrastructure.  The  infrastructure  to  be  developed  will  provide  water  for  drinking  and  sanitation  to  Botha‐Bothe  and  adjacent  villages.  This  is  planned  to  benefit  a  total  of  127  000  people  by  2027.  Ensuing  from  the  project  will  be  socio‐ economic  and  health  benefits  to  the  target  population  in  the  area.  The  project  will  also ease the water demand pressures from the industrial firms in Botha Bothe, with  the additional employment further benefitting the town’s population.    It is estimated that the total surface water storage to be created for this project will be  6 3 100 x 10  m .     The project is designed around five standardised components:    Expected results   River intakes to abstract raw water from the Hololo River;   Water treatment plant to convert the raw water into potable water;   Pipeline to transport the potable water to the demand centres;   Pumping station to lift the potable water to the demand centres; and   Bulk reservoir storages at strategic locations.  The  infrastructure  to  be  developed  will  provide  water  for  drinking  and  sanitation  to  Botha‐Bothe and adjacent villages. This is planned to benefit a total of 106 800 people  to the year 2020. Ensuing from the project will be socio‐economic and health benefits  to the target population in the area.��The project will also ease the demand pressures  from  the  industrial  firms  in  town,  with  the  employment  benefits  further  ensuing  to  the town’s population.  Ongoing  related  activities  in  the  Similar efforts in other SADC Member States pursuant to meeting the MDG targets on  region   water supply and sanitation services.  Description of national plan to the  The  feasibility  study  and  the  preliminary  designs  of  the  whole  Low  Lands  Water  project  Scheme were completed in September 2004. The institutional and policy framework  were  completed  in  February  2007  with  finalisation  of  the  Lesotho  Water  and  Sanitation Policy. The legal and regulatory frameworks were finalised in 2008 with the  passing of the Lesotho Water Act of 2008, the Lesotho Electricity and Water Authority  of  2008,  and  the  Water  and  Sewerage  Authority  Vesting  Bill  of  2008.  The  relevant  government  departments  have  approved  detailed  design  drawings  and  the  tender  dossiers  of  all  the  eight  zones  of  the  Low  Lands  Bulk  Water  Supply  Project.  While  Zones  4  and  5  of  the  Low  Lands  Water  Scheme  is  under  way,  the  other  zones  are  complete from the proposal view and awaiting funding.  Status    The  project  can  be  considered  to  be  in  Phase  5  of  the  ICA  Project  Development  114

Select target paragraph3