6. Water Sector Project Benefiting Member States Region Project Cost Expected Estimate Completion ($ billion) Year Project Status Inga Hydro-power DRC-shared regional electricity SADC 8.0 2017 Pre-feasibility study completed in 2011. Feasibility and design to follow Lesotho Highlands Phase II Lesotho and South Africa SADC 1.0 2017 Pre-feasibility study completed in 2011. Feasibility and design to follow Batoka George Hydo-power Zambia and Zimbabwe SADC 3.5 2015 Feasibility studies completed. Detailed design and tendering to follow (2012 – 2013) Songwe River Basin Malawi and Tanzania SADC 0.22 2017 Feasibility studies completed. Detailed design and tendering to follow (2012 – 2013) Okavango Multi-sector Investment Angola, Botswana and Namibia SADC 0.015 2016 Limpopo Joint Water Monitoring Botswana, Mozambique, South Africa and Zimbabwe SADC 0.007 2016 Lomahasha/NamaAcha Water Supply and Sanitation Mozambique and Swaziland SADC 0.250 2017 Institutional capacity enhancement, policy reform and harmonisation projects All Member States, river basin organisations and water utilities SADC 0.490 2013 – 2017 Series of projects with Terms of Reference and variable documentation available Total 36 Executive Summary 13.48 billion Pre-feasibility study completed. Feasibility expected to be completed by 2013

اختر الفقرة المستهدفة3